13.07.2015 Views

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CA</strong> <strong>No</strong> : <strong>CE</strong> (P) <strong>VIJAYAK</strong>/ /<strong>2<strong>01</strong>2</strong>-<strong>13</strong> <strong>Serial</strong> <strong>Page</strong> <strong>No</strong> : 09TENDER <strong>NO</strong>: <strong>CE</strong> (P) <strong>VIJAYAK</strong>/46/ 2<strong>01</strong>1-<strong>2<strong>01</strong>2</strong>S C H E D U L E ‘A’<strong>No</strong>te:-SCHEDULE OF REQUIREMENT1. The unit rates/amount quoted by the tenderer for the various items to this schedule shall bedeemed to <strong>in</strong>clude for the provision of all stores, labourer, material, tools/plants, equipments andtackle process, operation and specific requirement detailed <strong>in</strong> this schedule and <strong>in</strong> the Tech<strong>nic</strong>alspecifications and elsewhere <strong>in</strong> the tender documents and for full entries and f<strong>in</strong>al completion ofthe work <strong>in</strong> accordance with the provision of the tender documents.2. The tenderer is required to quote his unit rates both <strong>in</strong> words and figures under column-5 &column-6 and carry over the total amount under column 7 on Srl <strong>Page</strong> <strong>No</strong>. 10 to 11 hereto.3. The period of completion stipulated <strong>in</strong> <strong>No</strong>te-1 of Schedule ‘A’ shall be reckoned from the date ofhand<strong>in</strong>g over of site of work as <strong>in</strong>dicated <strong>in</strong> the Work Order(s). If the contractor does not takeover the site on or before the date of commencement given <strong>in</strong> Work Order the same shall betaken as deemed date of tak<strong>in</strong>g over site for reckon<strong>in</strong>g the completion period of the work.4. Works under this contract shall be completed <strong>in</strong> accordance with follow<strong>in</strong>g phas<strong>in</strong>g:-(a)100% of the works shall be completed with<strong>in</strong> 12 months from the date of plac<strong>in</strong>g ofwork order.5. <strong>No</strong> adjustment on account of variation <strong>in</strong> prices or on any account is permissible under thiscontract other than those specified at Clause 63 of General Condition of contract.6. The quantities quoted <strong>in</strong> column <strong>No</strong>. 4 at Srl <strong>Page</strong> <strong>No</strong>. 10 to 11 are approximate and are<strong>in</strong>serted as a guide only. If it is more or less the tenderer will have no claim on this account.However, the same shall not be varied beyond the deviation limit vide condition 7 of GeneralConditions of Contract (IAFW-2249-1987 pr<strong>in</strong>t)7. The total period of completion for the work will be reckoned from the date of commencementspecified <strong>in</strong> Work Order/hand<strong>in</strong>g over site.8. Rate quoted will be considered <strong>in</strong>clusive of all types of taxes.9. The tender shall rema<strong>in</strong> open and valid for acceptance for 60 days from the date ofopen<strong>in</strong>g.10. The material for the works shall be conform<strong>in</strong>g to Tech<strong>nic</strong>al specifications <strong>in</strong>dicated <strong>in</strong> the tender.11. The tender will be considered for acceptance as a whole.Signature of the Contractor with seal)Dated : _________________<strong>2<strong>01</strong>2</strong>for Accept<strong>in</strong>g Officer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!