13.07.2015 Views

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CA</strong> <strong>No</strong> : <strong>CE</strong> (P) <strong>VIJAYAK</strong>/ /<strong>2<strong>01</strong>2</strong>-<strong>13</strong> <strong>Serial</strong> <strong>Page</strong> <strong>No</strong> : 62TENDER <strong>NO</strong>: <strong>CE</strong> (P) <strong>VIJAYAK</strong>/46/ 2<strong>01</strong>1-<strong>2<strong>01</strong>2</strong>.SPECIAL CONDITIONS (Contd…)25.3.3. Any vehicle with an open load-carry<strong>in</strong>g area used for transport<strong>in</strong>g potentially dust produc<strong>in</strong>gmaterial shall have properly fitt<strong>in</strong>g side and tail boards. Materials hav<strong>in</strong>g the potential to producedust shall not be loaded to a level higher than the side and tail boards, and shall be covered with aclean tarpaul<strong>in</strong> <strong>in</strong> good condition. The tarpaul<strong>in</strong> shall be properly secured and extend at least 300mm over the edges of the side and tail boards.25.3.4. In the event that the Contractor is permitted to use gravel or earth roads for haulage, he shallprovide suitable measures for dust palliation, if these are, <strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer,necessary, Such measures may <strong>in</strong>clude spray<strong>in</strong>g the road surface with water at regular <strong>in</strong>tervals.25.4 <strong>No</strong>ise25.4.1 The Contractor shall consider noise as an environmental constra<strong>in</strong>t <strong>in</strong> his plann<strong>in</strong>g and executionof the Works.25.4.2 The Contractor shall take all necessary measures so that the operation of all mecha<strong>nic</strong>alequipment and construction processes on and off the Site shall not cause any unnecessary orexcessive noise, tak<strong>in</strong>g <strong>in</strong>to account applicable environment requirements. The Contractor shalluse all necessary measures and shall ma<strong>in</strong>ta<strong>in</strong> all plant and silenc<strong>in</strong>g equipment <strong>in</strong> good conditionso as to m<strong>in</strong>imize the noise emission dur<strong>in</strong>g construction works.25.5. Control of Wastes25.5.1 The Contractor shall control the disposal of all forms of waste generated by the constructionoperations and <strong>in</strong> all associated activities. <strong>No</strong> uncontrolled deposition or dump<strong>in</strong>g shall bepermitted. Wastes to be so controlled shall <strong>in</strong>clude, but shall not be limited to, all forms of fueland eng<strong>in</strong>e oils, all types of bitumen, cement, surplus aggregates, gravels, bitum<strong>in</strong>ous mixturesetc. The Contractor shall make specific provision for the proper disposal of these and any otherwaste products, conform<strong>in</strong>g to local regulations and acceptable to the Eng<strong>in</strong>eer-In-Charge.25.6. Emergency Response25.6.1.The Contractor shall plan and provide for remedial measures to be implemented <strong>in</strong> the event ofoccurrence of emergencies such as spillages of oil or bitumen or chemicals.25.6.2 The Contractor shall provide the Eng<strong>in</strong>eer-In-Charge with a statement of the measures he <strong>in</strong>tendsto implement <strong>in</strong> the event of such an emergency which shall <strong>in</strong>clude a statement of how he <strong>in</strong>tendsto provide personnel adequately tra<strong>in</strong>ed to implement such measures.25.7. Measurement25.7.1 <strong>No</strong> separate measurement shall be made <strong>in</strong> respect of compliance by the Contractor with theprovisions of this Section of the Specification. The Contractor shall be deemed to have madeallowance for such compliance with these provisions <strong>in</strong> the preparation of his prices for items ofwork <strong>in</strong>cluded <strong>in</strong> the Schedule’A’ and full compensation for such compliance will be deemed to becovered by them.26. MINIMUM FAIR WAGES PAYMENT TO LABOUR26.1 The Contractor shall pay wages not less than the m<strong>in</strong>imum fair wages fixed from time to time bythe Central Govt./State Govt./Local Authorities. He shall have no claim whatsoever, if on accountof any local regulations and/or otherwise, he is required to pay wages <strong>in</strong> excess of the wages sofixed.Signature of ContractorDated : _________________<strong>2<strong>01</strong>2</strong>For Accept<strong>in</strong>g Officer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!