13.07.2015 Views

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CA</strong> <strong>NO</strong>. <strong>CE</strong> (P) <strong>VIJAYAK</strong>/ /<strong>2<strong>01</strong>2</strong>-<strong>13</strong> <strong>Serial</strong> <strong>Page</strong> <strong>No</strong>: 61TENDER <strong>NO</strong>: <strong>CE</strong> (P) <strong>VIJAYAK</strong>/46/ 2<strong>01</strong>1-<strong>2<strong>01</strong>2</strong>25. PROTECTION OF THE ENVIRONMENT25.1 GeneralSPECIAL CONDITIONS (Contd…)25.1.1 This section of the Specification sets out limitations on the Contractor’s activities specifically<strong>in</strong>tended to protect the environment.25.1.2 The Contractor shall take all necessary measures and precautions and otherwise ensure that theexecution of the works and all associated operations on site or off-site are carried out <strong>in</strong> conformitywith statutory and regulatory environmental requirements <strong>in</strong>clud<strong>in</strong>g those prescribed elsewhere <strong>in</strong>this document.25.1.3 The Contractor shall take all measures and precautions to avoid any nuisance or disturbancearis<strong>in</strong>g from the execution of the works. This shall wherever possible be achieved by suppressionof the nuisance at source rather than abatement of the nuisance once generated.25.1.4 In the event of any spoil, debris, waste or any deleterious substance from the Site be<strong>in</strong>g depositedon any adjacent land, the Contractor shall immediately remove all such material and restore theaffected area to its orig<strong>in</strong>al state to the satisfaction of the Eng<strong>in</strong>eer.25.2 Water Quality25.2.1 The Contractor shall prevent any <strong>in</strong>terference with the supply to or abstraction from, and preventany pollution of, water resources (<strong>in</strong>clud<strong>in</strong>g underground percolat<strong>in</strong>g water) as a result of theexecution of the Works.25.2.2 Areas where water is regularly or repetitively used for dust suppression purposes shall be laid tofall to specially constructed settlement tanks to permit sedimentation of particulate matter. Aftersettlement, the water may be re-used for dust suppression and r<strong>in</strong>s<strong>in</strong>g.25.2.3 All water and other liquid waste products aris<strong>in</strong>g on the Site shall be collected and disposed of ata location on or off the Site and <strong>in</strong> a manner that shall not cause either nuisance or pollution.25.2.4 The Contractor shall not discharge or deposit any matter aris<strong>in</strong>g from the execution of the Works<strong>in</strong>to any waters except with the permission of the Eng<strong>in</strong>eer and the regulatory authoritiesconcerned.25.2.5. The Contractor shall at all times ensure that all exist<strong>in</strong>g stream courses and dra<strong>in</strong>s with<strong>in</strong>, andadjacent to, the Site are kept safe and free from any debris and any materials aris<strong>in</strong>g from theWorks.25.2.6. The Contractor shall protect all watercourses, waterways, ditches, canals, dra<strong>in</strong>s, lakes and thelike from pollution as a result of the execution of the Works.25.3 Air Quality25.3.1. The Contractor shall devise and arrange methods of work<strong>in</strong>g to m<strong>in</strong>imize dust, gaseous or otherair-borne emissions and carry out the Works <strong>in</strong> such a manner as to m<strong>in</strong>imize adverse impacts onair quality.25.3.2 The Contractor shall utilize effective water sprays dur<strong>in</strong>g delivery manufacture, process<strong>in</strong>g andhandl<strong>in</strong>g of materials when dust is likely to be created, and to dampen stored materials dur<strong>in</strong>g dryand w<strong>in</strong>dy weather. Stockpiles of friable materials shall be covered with clean tarpaul<strong>in</strong>s, withapplication of sprayed water dur<strong>in</strong>g dry and w<strong>in</strong>dy weather, Stockpiles of material or debris shallbe dampened prior to their movement, except where this is contrary to the Specification.Signature of ContractorDated : _________________<strong>2<strong>01</strong>2</strong>For Accept<strong>in</strong>g Officer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!