13.07.2015 Views

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

CA NO : CE (P) VIJAYAK/ /2012-13 Serial Page No : 01 ... - Bro.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CA</strong> <strong>No</strong> : <strong>CE</strong> (P) <strong>VIJAYAK</strong>/ /<strong>2<strong>01</strong>2</strong>-<strong>13</strong> <strong>Serial</strong> <strong>Page</strong> <strong>No</strong> : 58TENDER <strong>NO</strong>: <strong>CE</strong> (P) <strong>VIJAYAK</strong>/46/ 2<strong>01</strong>1-<strong>2<strong>01</strong>2</strong>SPECIAL CONDITIONS (Contd…)12. HIRING CHARGES OF LAND12.1 Payment of rent for road side land if any where equipment will be <strong>in</strong>stalled based on therequirement of work will be payable by contractor and this will not be reimbursable by thedepartment.<strong>13</strong>. TIME AND PROGRESS CHART<strong>13</strong>.1 The time and progress chart shall be prepared as per the General Condition of Contract. It shallconsist of detailed network analysis and a time schedule. The critical path of work will be drawnjo<strong>in</strong>tly by the OC Contract and the contractor soon after acceptance of the tender. The timeschedul<strong>in</strong>g of the activities <strong>in</strong>clud<strong>in</strong>g a net work for the prelim<strong>in</strong>ary arrangements for mobilization ofresources e.g. manpower, plant and mach<strong>in</strong>ery will be done by the contractor so as to completethe work with<strong>in</strong> the stipulated time. On completion of the time schedule a firm calendar dateschedule will be prepared and submitted by the Contractor to OC Contract <strong>in</strong> quadruplicate with <strong>in</strong>one week from the date of hand<strong>in</strong>g over the site.<strong>13</strong>.2 Dur<strong>in</strong>g the currency of the work, the contractor is expected to adhere to the time schedule and theadherence will be part of the contractor’s performance under the contract. Dur<strong>in</strong>g the execution ofthe work, the contractor is expected to participate <strong>in</strong> the meet<strong>in</strong>g for review and updat<strong>in</strong>g thenetwork under taken by OC Contract. These reviews may be under taken at the discretion of theOC Contract either as periodical appraisal measure or when the quantum of work ordered on theContractor is substantially changed through deviation orders or amendments. Any revision of theschedule as a result of the review will be submitted by the Contractor to the OC Contract with <strong>in</strong> aweek who will approve it after due scrut<strong>in</strong>y. The Contractor will adhere to the revised schedulethereafter.<strong>13</strong>.3 The Contractor is expected to mobilize and employ sufficient resources to achieve the detailedtime schedule with<strong>in</strong> the broad frame work of the accepted methods of work<strong>in</strong>g and safety.<strong>13</strong>.4 <strong>No</strong> additional payment will be made to the contractor for any multiple shift work or other <strong>in</strong>centivemethods contemplated by him <strong>in</strong> his work schedule even though the time schedule is approved bythe department.Signature of the Contractor with seal)Dated : _________________<strong>2<strong>01</strong>2</strong>for Accept<strong>in</strong>g Officer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!