13.07.2015 Views

Westminster Infrastructure Plan: Technical Assessment (2009) WCC

Westminster Infrastructure Plan: Technical Assessment (2009) WCC

Westminster Infrastructure Plan: Technical Assessment (2009) WCC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Westminster</strong> <strong>Infrastructure</strong> <strong>Plan</strong>: <strong>Technical</strong> <strong>Assessment</strong> 2006– 2026Final ReportFigure 3-2: Projected Electricity Demand for Central London, 2015City of London> 300 MW /km 2 by 2015kw / km 210 5xWest EndDocklandsSource: EDF EnergyDelivery wise, this should not be assumed to reflect the most physical work given thatcapacity may already be present and / or provided via schemes in hand, or indeedalready underway. Schemes already underway include a deep tunnel under the river toafford better interconnection between north and south London with upgrading works toexisting strategic intake points being completed. Other imminent schemes include twonew major substations (132kV transformation points) at Paddington and Fulham as wellas a deep tunnel from the City of London to East London (see Figure 3-3).November <strong>2009</strong> Page 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!