13.07.2015 Views

Westminster Infrastructure Plan: Technical Assessment (2009) WCC

Westminster Infrastructure Plan: Technical Assessment (2009) WCC

Westminster Infrastructure Plan: Technical Assessment (2009) WCC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Westminster</strong> <strong>Infrastructure</strong> <strong>Plan</strong>: <strong>Technical</strong> <strong>Assessment</strong> 2006– 2026Final ReportTable 4: Strategic <strong>Plan</strong>ning for <strong>Infrastructure</strong><strong>Infrastructure</strong>Item<strong>Infrastructure</strong>Provider/ResponsibleAgencyRelevant Strategic<strong>Plan</strong>ningProcess/DocumentsTimeframeGeographical CoverageElectricity EDF No strategic plan forelectricity infrastructure ispublicly available.Adequacy of Strategic<strong>Plan</strong>ningProcess/Document forProjected LDF GrowthsNot available and insufficientinformation.No <strong>Westminster</strong> specific planexists or has been madepublicly available.Gas National Grid No strategic plan for gasinfrastructure is publiclyavailable.Not available and insufficientinformation.No <strong>Westminster</strong> specific planexists or has been madepublicly available.Water Thames Water „Draft Water ResourcesManagement <strong>Plan</strong>, 2010-2035‟ (2008)Extends over 25 years.Covers the entire ThamesWater region area.No <strong>Westminster</strong> specific planexists or has been madepublicly available.The plan extends beyond theLDF planning period.However, the plan does notprovide detailed information onbaseline or future demand orsupply at the <strong>Westminster</strong>level.The document is not entirely ina format that readily lends itselfto translation into this studyand the requirements ofPPS12.November <strong>2009</strong> Page 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!