13.07.2015 Views

PN 57.4400.0100_020115 - Genie

PN 57.4400.0100_020115 - Genie

PN 57.4400.0100_020115 - Genie

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8. Support the boom cylinders with anadequate lifting device and place blockingunder the boom hoist cylinder.13. Tag and disconnect hydraulic hoses.9. Remove boom hoist cylinder pin.10. Support front and rear of boom assemblywith an adequate lifting device.WARNINGATTENTIONUse blocking to prevent damage to tubing whenchains or sling are wrapped around boom.11. Remove pin from small stabilizer cylinder.The weight of the boom assembly isapproximately 1323 lbs (600 kg). The weight ofeach boom hoist cylinder is approximately 159lbs (72 kg). Use adequate lifting equipment tosupport the boom assembly and cylinders. Failureto follow this warning could cause serious injuryto personnel or damage to the machine.14. Position boom assembly on suitable supportdevice near a strong anchor point. Supportthe boom with blocking to prevent damageto tubing.12. Remove pivot pin from rear of boom.DO NOT DISASSEMBLE ANY COMPONENT (S) DURING WARRENTY PERIOD WITHOUT CONTACTING TEREXLIFT.124 TX51-19M-1-SM 01-29-02<strong>57.4400.0100</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!