13.07.2015 Views

Limited Phase 1 Environmental Site Assessment - Scott County

Limited Phase 1 Environmental Site Assessment - Scott County

Limited Phase 1 Environmental Site Assessment - Scott County

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.3 Significant AssumptionsThe following were beyond the scope of the assessment:Sampling and analysis of radon, lead in water, soil and groundwater samples, and theevaluation of indoor and outdoor air quality, regulatory compliance, industrial hygiene, or noiseimpacts are beyond the scope of this evaluation.Evaluations of buildings within the road corridor or construction limits are beyond the scope ofthe evaluation.The identification of geological or geotechnical hazards were beyond the scope of theassessment.It is possible that even with the proper application of the methodologies followed in performing thisESA, there may exist conditions that could not be identified within the scope of the review or whichwere not reasonably identifiable from available information.The information obtained from our review of environmental databases, historical records, interviewsconcerning the project, and information obtained from the reconnaissance is reliable. However, thisESA cannot and does not warrant or guarantee that the information provided by these sources isaccurate or complete. The methodologies of this assessment are not intended to produce allinclusive or comprehensive results, but rather provide the <strong>Scott</strong> <strong>County</strong> Highway Division withinformation relating to the project.2.4 Limitations and Exceptions of <strong>Assessment</strong>The report was compiled based on information available from Federal, State, City and <strong>County</strong>information in the public domain. The conclusions and opinions herein are based on the informationcompiled in the report.No environmental site assessment can wholly eliminate uncertainty regarding the potential forcontamination in connection with a property or project. Performance of this ESA is intended toreduce, but not eliminate, uncertainty regarding the potential for identifying possible sources ofcontamination in connection with the project. Other limitations to this project include the following:We did not access individual parcels within the project area except for a reconnaissanceinspection of the project road improvement corridor.Individual parcel owners were not interviewed.It is possible that surrounding properties used fuel oil in the past. Spills, leaks or releases ofpetroleum products could generate contamination.It is possible that surrounding farms and agricultural land have hazardous waste, such assolvents, pesticides or fuel oil used for agricultural purposes and maintaining farmingequipment.Contamination could have occurred on surrounding properties, where there are/wereaboveground or underground storage tanks that are/were not registered with the Federal,State, and <strong>County</strong>, or where hazardous petroleum products and maintenance/cleaningchemicals are/were stored or used.2.5 Special Terms and Conditions4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!