13.07.2015 Views

Washington Works - DuPont

Washington Works - DuPont

Washington Works - DuPont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 36 WORKING CONDITIONS6.1 Personnel Accountability6.2 Visitor Control6.3 Site Security6.4 Off-Hour Access6.5 Prohibited Items6.6 Coordination with Others6.7 Co-Occupancy6.8 Supervision6.9 Competent Person6.10 Tool and Equipment Control6.11 Material Shipment and Storage6.12 Plant Road Closing6.13 Non-English Speaking Contractors6.14 Minimal Age Requirements6.15 Permits7. RECEIPT OF WORK AND INVOICING7.1 Daily Report of Work7.2 Receipt of Work7.3 Invoicing Requirements8 QUALITY8.1 Quality Control8.2 <strong>Washington</strong> <strong>Works</strong> Quality Control Procedures Manual9 Respectful Work Environment and Sexual Harassment10 DEFINITIONS10.1 Contract Administrator10.2 Field Contractor Administrator10.3 Field Representative11 Required Submittals before Beginning Work (If Applicable to Scope)12 SITE CONTACTSAppendix AAppendix BMinimally Acceptable Drug and Alcohol TestingCriminal Background Check LetterCopyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!