Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 276. WORKING CONDITIONS6.1 Personnel AccountabilityIn the event of a plant emergency or alarm, the electronic gate pass system (EGPS) is used toaccount for contractor personnel. Contractor employees must log in and out whenever they enteror exit the plant. Failure to properly login or log out will affect the accuracy of the head countingoperation and may put emergency responders in unnecessary danger by searching for unaccountedpersonnel who are not on the plant during the emergency/alarm situation.6.2 Visitor ControlAll visitors shall be cleared through <strong>DuPont</strong>'s Contract Administrator or Field ContractorAdministrator and escorted by <strong>DuPont</strong> or site security while on site. All Contractor visitors shallbe escorted by a full time Contractor’s site supervision and must have and be wearing theappropriate personal protective equipment in accordance with section 1.7.16.3 Site SecurityProper identification shall be provided before site entry is permitted. Vehicular traffic shall bekept to a minimum and all contractors, visitors and vehicles are subject to search.6.4 Off-Hour AccessAccess to work areas after normal work hours, requires the prior notification and approval of<strong>DuPont</strong>'s Field Administrator.6.5 Prohibited ItemsWeapons, firearms, ammunition, explosives, narcotics, alcoholic beverages, fossil-fueled handwarmers, “strike anywhere” matches, unapproved 2-way radios, cameras and tape recorders arestrictly prohibited on plant property. Cellular phones are allowed in non-hazardous areas, bysigned approval only.6.6 Coordination with OthersWhere Contractor’s work must be performed in conjunction with work by others, Contractor shallcooperate with <strong>DuPont</strong> in scheduling, coordinating, and sequencing its work with that of others soall work may proceed with minimal interference or delay.6.7 Co-OccupancyContractor shall provide all measures as may be required to protect existing facilities and workperformed by others from damage due to Contractor’s (including its tier subcontractor’s)operations or negligence. <strong>DuPont</strong> may suspend contractor’s operation until such protectivemeasures are provided and the cost for stand-by of Contractor’s, its tier subcontractor’s, or othercontractor’s men and equipment shall be at the Contractor’s expense.6.8 SupervisionIn order to insure job continuity all on site supervisors are required to attend all bid meetings,walk through, safety orientation or any interaction pertaining to the job. Contractor shall providefull-time supervision on site whenever the contractor or subcontractors are performing workaccording to the contract. This includes overtime and shift hours.Copyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!