13.07.2015 Views

Washington Works - DuPont

Washington Works - DuPont

Washington Works - DuPont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 22record signed by a responsible agent of your company. “Examples” of specific work tasks arelisted below, but are not limited to:Welding, Confined Space Entry, Crane Operation, HPWC, NDT(See Section 11 for additional work tasks)Current welder and crane operator certification, with proof of identification, is required for thespecific piece of equipment being used. Proof of a current annual physical for crane operatorsshall also be provided.2.5 Welding Specific TrainingAll users of oxy-fuel burning equipment shall be trained in safe operating techniques and theelectrical hazards of welding. Proof of training must be provided prior to the start of the work.3 FIRE PROTECTION3.1 ProceduresContractor shall observe the <strong>Washington</strong> <strong>Works</strong> fume release, fire, and disaster responseprocedures. The contractor’s job supervisor will be given a copy of and be oriented by thedesignated <strong>DuPont</strong> representative on the proper response to all fire and fume alarms as well asplant evacuation procedures in the event of an onsite disaster or other significant emergency event.The contractor’s on-site supervisor shall ensure that all of the contractors’ employees arethoroughly familiar with those procedures. Contractor will be reimbursed on a time-and-materialbasis for lost time resulting from evacuations due to fume release and fire or disaster drills.3.2 SmokingSmoking will be permitted only in areas designated by <strong>DuPont</strong>. All smoking materials shall becarried in plastic bags or containers while performing work in the Teflon® production areas at<strong>Washington</strong> <strong>Works</strong> and the employees must thoroughly wash their hands before handling anysmoking products.Smoking by a Contractor employee in any no designated area shall be considered cause to requirethe Contractor to remove that employee from the plant site immediately.3.3 “Strike Anywhere” Matches“Strike Anywhere” matches are not permitted on the Plant.3.4 Flammable MaterialsStorage and use of flammable materials will be subject to the approval of <strong>DuPont</strong>. Safety cabinetsand cans shall be used for storage and dispensing flammable liquids and must have prior approvalof <strong>DuPont</strong>. Gasoline powered tools or equipment are not permitted to be stored or operated insidebuildings without prior approval.Flammable liquids (including gasoline, diesel, etc.) in quantities greater than five (5) gallons shallbe stored and transported in Department of Transportation (DOT) approved containers. Properidentifying placards shall be displayed on these containers.Copyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!