13.07.2015 Views

Washington Works - DuPont

Washington Works - DuPont

Washington Works - DuPont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 171.33 Ground Fault ProtectionContractor shall provide ground fault circuit interrupter (GFCI) protection for all cord sets,receptacles, electrical tools and equipment connected by cord and plug which are used oravailable for use by its employees. All GFCI receptacles shall be placed at the source end of theelectrical service.The Contractor shall use UL- approved electrical equipment in accordance with the NationalElectric Code and OSHA.1.34 Connections to Power SourcesElectrical conductors shall not be connected to a power source until all field installation workassociated with the equipment, device, or apparatus has been completed. <strong>DuPont</strong> personnel shallenergize electrical equipment, devices or apparatus.1.35 Work On or Near Energized Electrical ServicesContractor shall comply with the site's safety procedures when working on or near energizedelectrical services. Close proximity work is not allowed without specific approval of <strong>DuPont</strong>.Hot work requires a specific job procedure and approval by <strong>DuPont</strong>. Hot work is defined asworking directly in contact with exposed, energized, electrical conductors. Close Proximitywork is defined as any work that has the potential for hands or tools to come in contact withexposed energized electrical conductors.1.36 LTT/ Lock, Tag and Try Procedure 508Contractor shall follow the site's lock, danger, tag, and try Procedure 508 before starting workon existing process or electrical systems and new systems which have been commissioned.Contract employees doing work that falls under the scope of Procedure 508 will receive the sitespecific requirements of this safety procedure in the general safety orientation. It is theContractor’s responsibility to provide initial and refresher training on the Contractor’s specificlockout procedure. Refresher training must be conducted on an annual basis. (Supplied asrequired during pre-job meeting)1.37 Gas CylindersCompressed gas cylinders shall be properly secured on two-wheel hand trucks designed for thisuse and brought into buildings only as needed and removed as soon as work is completed ortanks are emptied. Unless individual cylinders are equipped with regulating devices, they shallhave the safety cap secured in place when not in use.Combination hose line check-valve -flame-arrester units shall be installed between the hose andthe torch in both the fuel and the oxygen lines. Always utilize friction lighters when lightingtorches. A fire extinguisher must be located in the immediate work area whenever using anoxy-fuel rig.1.38 Construction EquipmentContractor and all tier subcontractors shall comply with the provisions of the <strong>DuPont</strong>Engineering Standard EN-1088, Entitled Major Equipment-Lump Sum & Rental, Operations,Control and Inspections. Contractor may obtain the forms required by EN-1088 from theContract Administrator.No D/C electrical current- producing receptacles on equipment shall be permitted on site.Equipment supplying electrical power to existing D/C electrical current receptacles on theequipment shall be disconnected or the receptacles covered and/or rendered inoperable. AllCopyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!