1.<strong>The</strong> preparation work to implement <strong>Basel</strong> <strong>II</strong>(1)set up the Enterprise-wide risk managementsystem 。 It is represented on the four aspects ofrisk policy and system build<strong>in</strong>g, risk measurement,<strong>in</strong>formation system, data consolidation.2


(2)set up the risk measurementsystem cover<strong>in</strong>g all k<strong>in</strong>ds ofcustomers and realized thescientific measurement on creditrisk, market risk, liquidity risk andoperational risk.4


Establish the IRB methodology and system.Referr<strong>in</strong>g to has developed a series of rat<strong>in</strong>gmodels cover<strong>in</strong>g corporate bus<strong>in</strong>ess, <strong>in</strong>terbankbus<strong>in</strong>ess, retail bus<strong>in</strong>ess and sovereignexposures. <strong>The</strong> data <strong>in</strong>dicates that thecorporate rat<strong>in</strong>g model has the goodperformance with AR 0.55 which has entered<strong>in</strong>to the <strong>in</strong>ternational standard (0.5-0.7).5


(3)Build up the IT system for IRB project.<strong>ICBC</strong> has developed the obligor rat<strong>in</strong>gsystem which is embedded with the rat<strong>in</strong>gmethodology and rat<strong>in</strong>g models and realizedthe whole process IT management fromobligor rat<strong>in</strong>g, credit l<strong>in</strong>e approval to postdisbursementmanagement. <strong>ICBC</strong> alsodeveloped the f<strong>in</strong>ancial report check<strong>in</strong>gsystem, the collateral appraisal managementIT systems to supply the data basis for facilityrat<strong>in</strong>g and the <strong>in</strong>dustrial analysis system tosupply the technology support for regionaland <strong>in</strong>dustrial risk rat<strong>in</strong>g and portfolioanalysis.6


(4) Build up the IRB data foundation.In 2002, <strong>ICBC</strong> conducted data consolidation project whichenables centralized and real-time process<strong>in</strong>g of credit riskmanagement and to further enhance customer rat<strong>in</strong>g, creditlimit, 12-grade loan classification, middle and long-termfacility rat<strong>in</strong>g functions.In 2003, <strong>ICBC</strong> developed the C<strong>II</strong>S, PCM2003 systems whichimproved the credit risk management efficiency andaccumulated the data for credit risk quantification. Until now<strong>ICBC</strong> has accumulated six-year loan <strong>in</strong>formation cover<strong>in</strong>g allk<strong>in</strong>ds of customers <strong>in</strong>clud<strong>in</strong>g the basic <strong>in</strong>formation, f<strong>in</strong>ancial<strong>in</strong>formation, trad<strong>in</strong>g and rat<strong>in</strong>g <strong>in</strong>formation, which satisfiedthe 5-year data accumulation requirements of the F-IRB.8


(5)Set up the policy basis of the IRB<strong>implementation</strong> and tra<strong>in</strong> the <strong>in</strong>ternal rat<strong>in</strong>gstaff.9


2.<strong>The</strong> ma<strong>in</strong> developments and advances of<strong>Basel</strong> <strong>II</strong> project.<strong>ICBC</strong> Risk Management Projects ListProject NameTime<strong>ICBC</strong> EWRM Project 2004<strong>ICBC</strong> Capital Management Project 2005<strong>ICBC</strong> Interest Rate Risk Management Project 2005<strong>ICBC</strong> Non-retail Credit Risk IRB Project 2005-2006<strong>ICBC</strong> Market Risk Management Project 2006<strong>ICBC</strong> Internal Audit Project 2006<strong>ICBC</strong> Retail Credit Risk IRB Project 200710


3、<strong>The</strong> problems and the challenge<strong>The</strong> exist<strong>in</strong>g problemsA. <strong>The</strong> loss data cannot meet the 7-year datarequirement.B. <strong>The</strong> obligor rat<strong>in</strong>g and facility rat<strong>in</strong>g modelsneed to be validated and calibrated.C. Need to develop the retail-bus<strong>in</strong>ess approvaland performance monitor<strong>in</strong>g risk quantificationmodels.D. Need to enhance the application of IRB resultson portfolio management.11


4、<strong>The</strong> work plan of next stepA. Expedite the application of the IRBresults on the whole process of riskmanagement.B. Advance the retail IRB project toimprove <strong>ICBC</strong> retail risk management.C. Expedite the data warehouseestablishment and improve the facilityrat<strong>in</strong>g system to lay the foundation for A-IRB.D. Enhance the establishment of riskculture.12