Responses to Comments<strong>Idaho</strong> <strong>Power</strong> CompanyRESPONSE TO COMMENT SBT1-48IPC acknowledged the uncertainty of predicting responses to improved inflow water quality inBrownlee Reservoir in the DLA and FLA. IPC adequately addressed the uncertainty by includingdevelopment of monitoring plans in its water quality PM&E measures.RESPONSE TO COMMENT SBT1-49IPC appreciates the <strong>Shoshone</strong>-<strong>Bannock</strong> <strong>Tribes</strong>’ support for its proposed oxygen injection PM&E.The aeration measures have been proposed by IPC to be implemented for the life of the license,therefore ensuring long-term implementation.RESPONSE TO COMMENT SBT1-50The measures have been proposed by IPC to be implemented for the life of the license, thereforeensuring long-term implementation.RESPONSE TO COMMENT SBT1-51The measures have been proposed by IPC to be implemented for the life of the license, thereforeensuring long-term implementation.RESPONSE TO COMMENT SBT1-52The measures have been proposed by IPC to be implemented for the life of the license, thereforeensuring long-term implementation.RESPONSE TO COMMENT SBT1-53The comment correctly identifies that inflow temperatures to Brownlee Reservoir currentlyexceed the coldwater and salmonid spawning standards. Changing operations of the HCC will donothing to remedy water temperature conditions in the inflow to Brownlee Reservoir. TableE.2-4 has been added to the FLA to more clearly show the improvement in temperatureconditions relative to appropriate bi-state targets identified in the draft Snake River–Hells Canyon TMDL.RESPONSE TO COMMENT SBT1-54IPC-proposed measures include full implementation of its oxygen load allocation identified inthe draft Snake River–Hells Canyon TMDL. IPC is assuming that all other upstream loadallocations identified in the draft Snake River–Hells Canyon TMDL will also be implemented.RESPONSE TO COMMENT SBT1-55Modeled proposed operations of the HCC will continue annual drawdowns (DLA, Exhibit B).Therefore, modeled proposed operations will continue to benefit migrant shorebirds and can beconsidered an enhancement of the habitat for these species.Page 56Hells Canyon Complex

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!