13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

contract duration (including extension, ifany plus 365 days i.e. Defect LiabilityPeriod) would be carried out as per theentire satisfaction and direction <strong>of</strong>engineer-in-charge.29 Traffic Management during execution asperClause 112 <strong>of</strong> MORTH SpecificationTotal Bid Price (in figures)1 JobExecutive Engineer Superintending Engineer Chief EngineerHPPWD, Chopal Division 12th Circle HPPWD Rohru South Zone, HPPWD,Nirman Bhawan, Shimla(1) Item for which no rate or price has been entered in will not be paid for by the Employer when executedand shall be deemed covered by the other rates and prices in the Bill <strong>of</strong> Quantities (refer: ITB Clause13.2 and GCC Clause 43.3).(2) Unit rates and prices shall be quoted by the bidder in Indian rupee [ITB Clause 14.1].(3) Where there is a discrepancy between the rate in figures and words, the rates in words will govern.[ITB Clause 27.1 (a)](4) Where there is a discrepancy between the unit rate and the line item total resulting from multiplying theunit rate by quantity, the unit rate quoted shall govern [ITB Clause 27.1 (b)].Contractor EE 83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!