CIVIL WORK - Government of Himachal Pradesh
CIVIL WORK - Government of Himachal Pradesh
CIVIL WORK - Government of Himachal Pradesh
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
edition) including hauling <strong>of</strong> materialin all leads and lifts by all modes <strong>of</strong>transportation. The aluminum sheetingshall be provided with duly painted25x25x3mm angle iron frame along itsperiphery.(b)Environment Management Measures21. Collection <strong>of</strong> trees seedling from nurseriesin all leads and lift and as per the entiresatisfaction and direction <strong>of</strong> Engineer-incharge.(Avenue plantation and group plantation)22. Road side tree planting containerized treeand shrub seedling including pittingtransporting composting and mulching onslopes in between 45 to 60 degree. Pit size30cm dia meter × 30cm depth, mixedcomposite with soil, labours andtransportation to the site in all leads andlift and as per the entire satisfaction anddirection <strong>of</strong> Engineer-in-charge.(Brush layering and hedge layering)23. Site preparation for fascines laying earthwork in excavations <strong>of</strong> trench to 20cm.Depth.24. Laying <strong>of</strong> live fascines using live hardwood cutting <strong>of</strong> selected species (eg.Assuro, Namdi, Phul, Saruwa and Smali)<strong>of</strong> minimum one meter length placed inbundles to give 4 running metere <strong>of</strong>cutting per metere <strong>of</strong> fascine i/c backfilling <strong>of</strong> trench and careful compaction25. Preparation and planting <strong>of</strong> live pegs <strong>of</strong>selected species (eg. Assuro, Namdi, Phul,Saruwa and simali) <strong>of</strong> minimum 1.0 metrelength <strong>of</strong> 0.50 metre depth into hardground, pegs spaced at 5.0 cm centrewithin rows, but 5.0 cm centre withinrows, but 5.0-20.0 cm between rows andinter-woven with vegetation.26 Dressing the ground i/c cutting and fillingup to 15cm (a) Spade 50% + pick work50%27 Collection <strong>of</strong> hardwood cutting forplanting material from sources within 1km <strong>of</strong> road. Material to be approximately1 mt length and minimum 5 cm indiameter.(C)Routine Maintenance Works28 Routine maintenance <strong>of</strong> activities as perannexure Schedule 3 shall be theresponsibility <strong>of</strong> the contractor and thecost <strong>of</strong> routine maintenance for the entire1200 Each1200 Each70 Rmt2800 Rmt7400 Rmt1050. Sqmt.21000.00 100 Nos.52.00Per kmper yearContractor EE 82