13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

edition) including hauling <strong>of</strong> materialin all leads and lifts by all modes <strong>of</strong>transportation. The aluminum sheetingshall be provided with duly painted25x25x3mm angle iron frame along itsperiphery.(b)Environment Management Measures21. Collection <strong>of</strong> trees seedling from nurseriesin all leads and lift and as per the entiresatisfaction and direction <strong>of</strong> Engineer-incharge.(Avenue plantation and group plantation)22. Road side tree planting containerized treeand shrub seedling including pittingtransporting composting and mulching onslopes in between 45 to 60 degree. Pit size30cm dia meter × 30cm depth, mixedcomposite with soil, labours andtransportation to the site in all leads andlift and as per the entire satisfaction anddirection <strong>of</strong> Engineer-in-charge.(Brush layering and hedge layering)23. Site preparation for fascines laying earthwork in excavations <strong>of</strong> trench to 20cm.Depth.24. Laying <strong>of</strong> live fascines using live hardwood cutting <strong>of</strong> selected species (eg.Assuro, Namdi, Phul, Saruwa and Smali)<strong>of</strong> minimum one meter length placed inbundles to give 4 running metere <strong>of</strong>cutting per metere <strong>of</strong> fascine i/c backfilling <strong>of</strong> trench and careful compaction25. Preparation and planting <strong>of</strong> live pegs <strong>of</strong>selected species (eg. Assuro, Namdi, Phul,Saruwa and simali) <strong>of</strong> minimum 1.0 metrelength <strong>of</strong> 0.50 metre depth into hardground, pegs spaced at 5.0 cm centrewithin rows, but 5.0 cm centre withinrows, but 5.0-20.0 cm between rows andinter-woven with vegetation.26 Dressing the ground i/c cutting and fillingup to 15cm (a) Spade 50% + pick work50%27 Collection <strong>of</strong> hardwood cutting forplanting material from sources within 1km <strong>of</strong> road. Material to be approximately1 mt length and minimum 5 cm indiameter.(C)Routine Maintenance Works28 Routine maintenance <strong>of</strong> activities as perannexure Schedule 3 shall be theresponsibility <strong>of</strong> the contractor and thecost <strong>of</strong> routine maintenance for the entire1200 Each1200 Each70 Rmt2800 Rmt7400 Rmt1050. Sqmt.21000.00 100 Nos.52.00Per kmper yearContractor EE 82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!