CIVIL WORK - Government of Himachal Pradesh
CIVIL WORK - Government of Himachal Pradesh
CIVIL WORK - Government of Himachal Pradesh
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2100 <strong>of</strong> MORT&H specification(latest edition) including the cost <strong>of</strong>form work and hauling <strong>of</strong> materialsand machinery in all leads and lifts byall modes <strong>of</strong> transportation.6. Backfilling with hand packed stoneupto thickness <strong>of</strong> not less than 600mmbehind abutment, wing wall and returnwall Retaining wall Breast wall in allheights and depths complete as perdrawings & technical section 2200 <strong>of</strong>MORT&H Specification (latestedition) and Clause 710.1.4 <strong>of</strong> IRC: 78including hauling <strong>of</strong> material in allleads and lifts by all modes <strong>of</strong>transportation.7. Providing, laying and jointingreinforced cement concrete pipeNP4 pre-stressed concrete pipe forculverts on first class bedding <strong>of</strong>granular material in single rowincluding fixing collar with cementmortar 1:2 (one cement: two sand) butexcluding excavation, protectionworks, back filling, concrete andmasonry works in head walls andparapets as per drawings and technicalspecifications section 2900 <strong>of</strong>MORT&H specification (latestedition) including hauling <strong>of</strong> materialin all leads and lifts by all modes <strong>of</strong>transportation.-1000 mm diameter8. Providing and laying plain cementconcrete 1:5:10 mix (one cement: fivesand: ten crushed hard stone aggregate40mm (forty millimeter) nominal size)with 15% plum, the size <strong>of</strong> plum shallusually be 150mm to 300mm,mechanically mixed placed infoundation compacted by vibration andcuring complete ensuring nonsegregationconforming to clause9.3.17 <strong>of</strong> section 9 <strong>of</strong> HPPWDspecification including the cost <strong>of</strong> formwork and hauling <strong>of</strong> materials andmachinery in all leads and lifts by allmodes <strong>of</strong> transportation.In parapets including form work.9. Maintenance <strong>of</strong> earthen shoulders(filling with fresh Soil) Making up loss449.88 cubicmeter52.50 RunningMeter314.97 CubicMeter32119.79 SquareMeter..Contractor EE 77