13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2100 <strong>of</strong> MORT&H specification(latest edition) including the cost <strong>of</strong>form work and hauling <strong>of</strong> materialsand machinery in all leads and lifts byall modes <strong>of</strong> transportation.6. Backfilling with hand packed stoneupto thickness <strong>of</strong> not less than 600mmbehind abutment, wing wall and returnwall Retaining wall Breast wall in allheights and depths complete as perdrawings & technical section 2200 <strong>of</strong>MORT&H Specification (latestedition) and Clause 710.1.4 <strong>of</strong> IRC: 78including hauling <strong>of</strong> material in allleads and lifts by all modes <strong>of</strong>transportation.7. Providing, laying and jointingreinforced cement concrete pipeNP4 pre-stressed concrete pipe forculverts on first class bedding <strong>of</strong>granular material in single rowincluding fixing collar with cementmortar 1:2 (one cement: two sand) butexcluding excavation, protectionworks, back filling, concrete andmasonry works in head walls andparapets as per drawings and technicalspecifications section 2900 <strong>of</strong>MORT&H specification (latestedition) including hauling <strong>of</strong> materialin all leads and lifts by all modes <strong>of</strong>transportation.-1000 mm diameter8. Providing and laying plain cementconcrete 1:5:10 mix (one cement: fivesand: ten crushed hard stone aggregate40mm (forty millimeter) nominal size)with 15% plum, the size <strong>of</strong> plum shallusually be 150mm to 300mm,mechanically mixed placed infoundation compacted by vibration andcuring complete ensuring nonsegregationconforming to clause9.3.17 <strong>of</strong> section 9 <strong>of</strong> HPPWDspecification including the cost <strong>of</strong> formwork and hauling <strong>of</strong> materials andmachinery in all leads and lifts by allmodes <strong>of</strong> transportation.In parapets including form work.9. Maintenance <strong>of</strong> earthen shoulders(filling with fresh Soil) Making up loss449.88 cubicmeter52.50 RunningMeter314.97 CubicMeter32119.79 SquareMeter..Contractor EE 77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!