13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

erosion, damage to hill side, waterpollution etc. and to protect stability <strong>of</strong>hill side rock shall be excavated withchiseling and wedging out rock (whereblasting is prohibited). All earth workin excavation including rockexcavation shall be carried out true tolines, grades, side slopes, width,camber, super elevation and level asshown on the drawings. Disposal <strong>of</strong>unserviceable cut materials inspecified manner includingloading/un-loading upto all leads andlift, trimming/filling <strong>of</strong> unevennessblind edge and finishing <strong>of</strong> the road tospecified dimension. If the foundation<strong>of</strong> the structure is in an area withstagnant water or water is met with inthe excavation due to spring, seepage,rain and other causes it shall beremoved by suitable diversion, bailingout or dewatering and the area <strong>of</strong> thefoundation or embankment shall bekept dry. Any loss to the public orprivate property during the course <strong>of</strong>excavation shall be the soleresponsibility <strong>of</strong> the contractor whichshall have to be duly compensated byhim at his own cost in all cases.4. Providing and laying plain cementconcrete 1:3:6 mix (one cement: threesand: six crushed hard stone aggregate20mm (twenty millimeter) nominalsize), mechanically mixed placed infoundation compacted by vibration andcuring complete ensuring nonsegregationconforming as per section2100 <strong>of</strong> MORT&H specification(latest edition) including the cost <strong>of</strong>form work and hauling <strong>of</strong> materialsand machinery in all leads and lifts byall modes <strong>of</strong> transportation.5. Providing and laying plain cementconcrete 1:3:6 mix (one cement: threesand: six crushed hard stone aggregate40mm (twenty millimeter) nominalsize), mechanically mixed placed infoundation compacted by vibration andcuring complete ensuring nonsegregationconforming as per section236.15 CubicMetre1511.11 CubicMetreContractor EE 76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!