CIVIL WORK - Government of Himachal Pradesh
CIVIL WORK - Government of Himachal Pradesh
CIVIL WORK - Government of Himachal Pradesh
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Name <strong>of</strong> Work :SCHEDULE-1BILL OF QUANTITIESPeriodic Maintenance <strong>of</strong> Sainj Chopal Nerwa Shallu RoadPackage No. HP-SH-08-219 (Sub Head: Providing and Laying20mm thick open-graded premix surfacing, Pr<strong>of</strong>ile CorrectionCourse, Repair to C.D. Works, Retaining walls and Breast walls,Side Drain and Parapets in PCC and road side furniture and fixingsign boards and & Bioengineering measures)i. Section from KM 38/0 to KM 90/0Mandatory work: The cost <strong>of</strong> routine maintenance <strong>of</strong> activities as per annexure Schedule 3shall be the responsibility <strong>of</strong> the contractor and the cost <strong>of</strong> routine maintenance for the entirecontact duration (including extension, if any) plus 365 days (i.e. Defect Liability Period) is tobe carried out by the contractor <strong>of</strong> which lump sum rate per Kilometer per year shall be paidseparately.Sr. Sub-Head & item <strong>of</strong> work Quantity Unit RateNo.In In wordsfigures1 2 3 4 5 6(a) Civil Works1. Excavation for roadways in all kind <strong>of</strong> 37388.03 cubicsoil such as pick work, jumper work,meters<strong>of</strong>t and hard rock including chiseling& wedging out <strong>of</strong> rock, if required andsaturated soil and their intermediateclassification in all heights and depths.Disposal <strong>of</strong> the unserviceable materialincluding loading/un-loading upto alllead and lifts for carrying theunserviceable materials. The recovery<strong>of</strong> stones shall be affected @ Rs.170/-per cum. for the quantum <strong>of</strong> 10520.41Cum useful stone on pro-rata basis asper increase/decrease <strong>of</strong> actualearthwork carried out. Any loss topublic or private property during thecourse <strong>of</strong> excavation shall be the soleresponsibility <strong>of</strong> the contractor, whichshall have to be duly compensated byhim at his own cost in all case. Thework shall be carried out as per clause301 <strong>of</strong> section 300 <strong>of</strong> MORTHspecification (latest edition)2. Earth work in excavation for structuresin all depths as per drawings andtechnical specification as per Clause304 <strong>of</strong> section 300 <strong>of</strong> MORT&Hspecifications (latest edition) includingsetting out, construction <strong>of</strong> shoring andbracing, removal <strong>of</strong> stumps and other476.00 cubicmeterAmountContractor EE 74