13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

always provided that the advance shall be completely repaid prior to the expiry <strong>of</strong> the original time forcompletion.Repayment <strong>of</strong> secured advance:The advance shall be repaid from each succeeding monthly payments to the extentmaterials [for which advance was previously paid pursuant to Clause 51.4 <strong>of</strong> G.C.C. and51(3) <strong>of</strong> Contract Data on prepage] have been incorporated into the Works.The Securities shall be for the following minimum amounts equivalent as a percentage <strong>of</strong> [52]the Contract Price:Performance Security for 5 per cent <strong>of</strong> contract price plus Rs. ............ as additional securityfor unbalanced bids (in terms <strong>of</strong> ITB Clause 29.5).The standard form <strong>of</strong> Performance Security acceptable to the Employer shall be an unconditionalBank Guarantee <strong>of</strong> the type as presented in Section 8 <strong>of</strong> the Bidding Documents.The following events shall also be fundamental breach <strong>of</strong> contract: [59.2]1. The Contractor has contravened Sub-clause 7 <strong>of</strong> GCC read with SCC and Clause 9.0 <strong>of</strong>GCC2. The contractor does not adhere to the agreed construction program (Clause 27 <strong>of</strong> GCC) andalso fails to take satisfactory remedial action as per agreements reached in the managementmeetings (Clause 31) for a period <strong>of</strong> 30 days.3. The contractor fails to carry out the instructions <strong>of</strong> Engineer within a reasonable timedetermined by the Engineer in accordance with GCC Clause 16.1 and 23.1.The percentage to apply to the value <strong>of</strong> the work not completed representing the Employer's [60]additional cost for completing the Works shall be 20 percent.The period for setting up a field laboratory with the prescribed equipmentis 15 days from the date <strong>of</strong> notice to proceed with the work._______________________________________Contractor EE 68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!