13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The amounts <strong>of</strong> the advance payment are: [51]Nature <strong>of</strong> Advance Amount (Rs.) Conditions to be fulfilled1. Mobilization 5% <strong>of</strong> the Contract price On submission <strong>of</strong> un-conditional BankGuarantee.(to be drawn before end <strong>of</strong> 20% <strong>of</strong> Contractperiod)2. Equipment(This advance is notapplicable forequipment alreadyowned or hired/ leasedby the contractor.)90% for new and 50% <strong>of</strong>depreciated value for oldequipment. Total amountwill be subject to amaximum <strong>of</strong> 5% <strong>of</strong> theContract price.After equipment is brought to site as per agreedconstruction program (provided the Engineer issatisfied that the equipment is required forperformance <strong>of</strong> the contract) and on submission<strong>of</strong> unconditional Bank Guarantee for amount <strong>of</strong>advance.3. Secured advance fornon- perishablematerials brought tosite75% <strong>of</strong> Invoice value orMarket value - lower <strong>of</strong> thetwo.a) The materials are in-accordance with thespecification for Works;b) Such materials have been delivered to site,and are properly stored and protected againstdamage or deterioration to the satisfaction <strong>of</strong>the Engineer. The contractor shall store thebulk material in measurable stacks.;c) The Contractor’s records <strong>of</strong> the requirements,orders, receipt and use <strong>of</strong> materials are keptin a form approved by the Engineer and suchrecords shall be available for inspection bythe Engineer;d) The contractor has submitted with hismonthly statement the estimated value <strong>of</strong> thematerials on site together with suchdocuments as may be required by theEngineer for the purpose <strong>of</strong> valuation <strong>of</strong> thematerials and providing evidence <strong>of</strong>ownership and payment there<strong>of</strong>;e) Ownership <strong>of</strong> such materials shall be deemedvest in the Employer for which thehas submitted an Indemnity Bond in anacceptable format; andf) The quantity <strong>of</strong> materials are not excessiveand shall be used within a reasonable time asdetermined by the Engineer.(The advance payment will be paid to the Contractor no later than 15 days after fulfillment <strong>of</strong> the aboveconditions).Repayment <strong>of</strong> advance payment for mobilization and equipment: [51]The advance shall be repaid with percentage deductions from the interim payments certified by the Engineerunder the Contract. Deductions shall commence in the next Interim Payment Certificate following that inwhich the total <strong>of</strong> all such payments to the Contractor has reached not less than 15 percent <strong>of</strong> the ContractPrice or 3 months from the date <strong>of</strong> payment <strong>of</strong> first installment <strong>of</strong> advance, whichever period concludesearlier, and shall be made at the rate <strong>of</strong> 15 percent <strong>of</strong> the amounts <strong>of</strong> all Interim Payment Certificates untilsuch time as the entire advance is recovered before 80% payments <strong>of</strong> the total contract price are released,Contractor EE 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!