13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The name and identification number <strong>of</strong> the Contract is Periodic Maintenance <strong>of</strong> Sainj Chopal NerwaShallu Road km. 38/0 to 90/0 under State Roads Project Package No.HP-SH-08. [1.1]For each road details refer Schedule 2The Works consist <strong>of</strong>: the periodic maintenance works on roads listed in Schedule 2Providing and Laying 20mm thick open-graded premix surfacing, Pr<strong>of</strong>ile Correction Course, Repair toC.D. Works, Side Drain and Parapets in PCC and road side furniture and fixing sign boards and &Bioengineering measures accordance with the requirement <strong>of</strong> Specifications and drawings all aspects <strong>of</strong> qualityassurance <strong>of</strong> various components <strong>of</strong> the work, rectification <strong>of</strong> the Defects in the completed works during theDefects Liability Period and other item <strong>of</strong> works as may be required to be carried out for completing the works inaccordance with the provisions <strong>of</strong> the contract to ensure safety along the roads.The Start Date shall be the 10 th day after date <strong>of</strong> issue <strong>of</strong> notice to proceed with the work. (1.1)The Intended Completion Date for the whole<strong>of</strong> the Works is Twelve months with the following milestones: [17, 28]Milestone dates:Physical works to be completedPeriod from the date <strong>of</strong> issue <strong>of</strong>notice to proceed with the workMilestone 1 i.e completion <strong>of</strong> all repair works except bituminous up to 3 months <strong>of</strong> the periodworks & road furniture.allowed for completion <strong>of</strong> workMilestone 2 i.e completion <strong>of</strong> Providing and Laying Pre Mix Carpeton 52 km road lengthup to 9 months <strong>of</strong> the periodallowed for completion <strong>of</strong> workMilestone 3 i.e completion <strong>of</strong> the entire periodic up to 12 months <strong>of</strong> the periodmaintenance works including EMP road furniture etc. allowed for completion <strong>of</strong> workMilestone 4 For EMM and routine maintenanceupto defect liability periodThe following documents also form part <strong>of</strong> the Contract: NIL [2.3]The Contractor shall submit a Program including Generic EnvironmentalManagement Plan for the Works within 14 days <strong>of</strong> delivery <strong>of</strong> theLetter <strong>of</strong> Acceptance. [27][This programme should be in adequate detail and generally conform to the program submitted along withbid in response to ITB Clause 4.3 (k). Deviations if any from that should be clearly explained and should besatisfactory to the Engineer.]The Site Possession Dates shall be: Date <strong>of</strong> Issue <strong>of</strong> notice to proceed with the work [21]The Site is located at: District Shimlaand defined in the Index Map. [1]The Defects Liability Period is 365 days from the date <strong>of</strong> certification <strong>of</strong> completion <strong>of</strong> works. [35](where sectional completion certificate is issued, this will apply from those dates for those sections)Contractor EE 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!