13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

42.4 The value <strong>of</strong> work executed shall comprise the value <strong>of</strong> the quantities <strong>of</strong> the items in the Bill <strong>of</strong>Quantities completed.42.5 The value <strong>of</strong> work executed shall include the valuation <strong>of</strong> Variations and Compensation Events.42.6 The Engineer may exclude any item certified in a previous certificate or reduce the proportion <strong>of</strong>any item previously certified in any certificate in the light <strong>of</strong> later information.43. Payments43.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries interms <strong>of</strong> the contract and taxes, at source, as applicable under the law. The Employer shall pay theContractor the amounts certified by the Engineer within 28 days <strong>of</strong> the date <strong>of</strong> each certificate. Ifthe Employer makes a late payment, the Contractor shall be paid interest on the late payment inthe next payment. Interest shall be calculated from the date by which the payment should havebeen made upto the date when the late payment is made at 8% per annum.43.2 If an amount certified is increased in a later certificate or as a result <strong>of</strong> an award by theAdjudicator or an Arbitrator, the Contractor shall be paid interest upon the delayed payment as setout in this clause. Interest shall be calculated from the date upon which the increased amountwould have been certified in the absence <strong>of</strong> dispute.43.3 Items <strong>of</strong> the Works for which no rate or price has been entered in will not be paid for by theEmployer and shall be deemed covered by other rates and prices in the Contract.44. Compensation Events44.1 The following are Compensation Events unless they are caused by the Contractor:(a)(b)(c)(d)(e)(f)(g)(h)(i)The Employer does not give access to a part <strong>of</strong> the Site by the Site Possession Date statedin the Contract Data.The Employer modifies the schedule <strong>of</strong> other contractors in a way which affects the work<strong>of</strong> the contractor under the contract.The Engineer orders a delay or does not issue drawings, specifications or instructionsrequired for execution <strong>of</strong> works on time.The Engineer instructs the Contractor to uncover or to carry out additional tests uponwork which is then found to have no Defects.The Engineer unreasonably does not approve for a subcontract to be let.Ground conditions are substantially more adverse than could reasonably have beenassumed before issuance <strong>of</strong> Letter <strong>of</strong> Acceptance from the information issued to Bidders(including the Site Investigation Reports), from information available publicly and from avisual inspection <strong>of</strong> the Site.The Engineer gives an instruction for dealing with an unforeseen condition, caused by theEmployer, or additional work required for safety or other reasons.Other contractors, public authorities, utilities or the Employer does not work within thedates and other constraints stated in the Contract, and they cause delay or extra cost to theContractor.The advance payment is delayed.Contractor EE 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!