C. Quality Control33. Identifying Defects33.1 The Engineer shall check the Contractor's work and notify the Contractor <strong>of</strong> any Defects that arefound. Such checking shall not affect the Contractor's responsibilities. The Engineer may instructthe Contractor to search for a Defect and to uncover and test any work that the Engineer considersmay have a Defect33.2 The contractor shall permit the Employer’s Technical auditor to check the Contractor’s work andnotify the Engineer and Contractor <strong>of</strong> any defects that are found. Such a check shall not affect theContractor’s or the Engineer’s responsibility as defined in the Contract Agreement.34. Tests34.1 If the Engineer instructs the Contractor to carry out a test not specified in the Specification tocheck whether any work has a Defect and the test shows that it does, the Contractor shall pay forthe test and any samples. If there is no Defect the test shall be a Compensation Event.35. Correction <strong>of</strong> Defects35.1 The Engineer shall give notice to the Contractor <strong>of</strong> any Defects before the end <strong>of</strong> the DefectsLiability Period, which begins at Completion and is defined in the Contract Data. The DefectsLiability Period shall be extended for as long as Defects remain to be corrected.35.2 Every time notice <strong>of</strong> a Defect is given, the Contractor shall correct the notified Defect within thelength <strong>of</strong> time specified by the Engineer’s notice.36. Uncorrected Defects36.1 If the Contractor has not corrected a Defect within the time specified in the Engineer’s notice, theEngineer will assess the cost <strong>of</strong> having the Defect corrected, and the Contractor will pay thisamount.Note: Where in certain cases, the technical specifications provide for acceptance <strong>of</strong> works withinspecified tolerance limits at reduced rates, Engineer will certify payments to Contractoraccordingly.D. Cost Control37. Bill <strong>of</strong> Quantities37.1 The Bill <strong>of</strong> Quantities shall contain items for the construction, installation, testing, andcommissioning works to be done by the Contractor.37.2 The Bill <strong>of</strong> Quantities is used to calculate the Contract Price. The Contractor is paid for thequantity <strong>of</strong> the work done at the rate in the Bill <strong>of</strong> Quantities for each.38. Changes in the Quantities38.1 If the final quantity <strong>of</strong> the work done differs from the quantity in the Bill <strong>of</strong> Quantities for theparticular item by more than 25 percent provided the change exceeds 1% <strong>of</strong> initial Contract Price,the Engineer shall adjust the rate to allow for the change.Contractor EE 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!