9.3 The Contractor shall not employ any retires Gazetted <strong>of</strong>ficer who has worked in theEngineering Department <strong>of</strong> the State <strong>Government</strong> and has either not completed two years after hedate <strong>of</strong> retirement or has not obtained State <strong>Government</strong>’s permission to employment with theContractor.10. Employer’s and Contractor's Risks10.1 The Employer carries the risks which this Contract states are Employer’s risks, and the Contractorcarries the risks which this Contract states are Contractor’s risks.11. Employer's Risks11.1 The Employer is responsible for the excepted risks which are (a) in so far as they directly affectthe execution <strong>of</strong> the Works in the Employer’s country, the risks <strong>of</strong> war, hostilities, invasion, act <strong>of</strong>foreign enemies, rebellion, revolution, insurrection or military or usurped power, civil war, riotcommotion or disorder (unless restricted to the Contractor’s employees), and contamination fromany nuclear fuel or nuclear waste or radioactive toxic explosive, or (b) a cause due solely to thedesign <strong>of</strong> the Works, other than the Contractor’s design.12. Contractor’s Risks12.1 All risks <strong>of</strong> loss <strong>of</strong> or damage to physical property and <strong>of</strong> personal injury and death which ariseduring and in consequence <strong>of</strong> the performance <strong>of</strong> the Contract other than the excepted risks are theresponsibility <strong>of</strong> the Contractor.13. Insurance13.1 The Contractor shall provide, in the joint names <strong>of</strong> the Employer and the Contractor, insurancecover from the Start Date to the end <strong>of</strong> the Defects Liability Period, in the amounts anddeductibles stated in the Contract Data for the following events which are due to the Contractor’srisks:(a) loss <strong>of</strong> or damage to the Works, Plant and Materials;(b) loss <strong>of</strong> or damage to Equipment;(c) loss <strong>of</strong> or damage <strong>of</strong> property (except the Works, Plant, Materials and Equipment) inconnection with the Contract; and(d) personal injury or death.13.2 Policies and certificates for insurance shall be delivered by the Contractor to the Engineer for theEngineer’s approval before the Start Date. All such insurance shall provide for compensation to bepayable in the types and proportions <strong>of</strong> currencies required to rectify the loss or damage incurred.13.3 If the Contractor does not provide any <strong>of</strong> the policies and certificates required, the Employer mayeffect the insurance which the Contractor should have provided and recover the premiums theEmployer has paid from payments otherwise due to the Contractor or, if no payment is due, thepayment <strong>of</strong> the premiums shall be a debt due.13.4 Alterations to the terms <strong>of</strong> insurance shall not be made without the approval <strong>of</strong> the Engineer.13.5 Both parties shall comply with any conditions <strong>of</strong> the insurance policies.14. Site Investigation Reports14.1 The Contractor, in preparing the Bid, shall rely on any site Investigation Reports referred to in theContract Data, supplemented by any information available to the Bidder.Contractor EE 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!