13.07.2015 Views

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

CIVIL WORK - Government of Himachal Pradesh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

26. Examination <strong>of</strong> Bids and Determination <strong>of</strong> Responsiveness26.1 Prior to the detailed evaluation <strong>of</strong> Bids, the Employer will determine whether each Bid (a) meetsthe eligibility criteria defined in Clause 3; (b) has been properly signed; (c) is accompanied by therequired securities and; (d) is substantially responsive to the requirements <strong>of</strong> the Biddingdocuments.26.2 A substantially responsive Bid is one which conforms to all the terms, conditions, andspecifications <strong>of</strong> the Bidding documents, without material deviation or reservation. A materialdeviation or reservation is one (a) which affects in any substantial way the scope, quality, orperformance <strong>of</strong> the Works; (b) which limits in any substantial way, inconsistent with the Biddingdocuments, the Employer's rights or the Bidder's obligations under the Contract; or (c) whoserectification would affect unfairly the competitive position <strong>of</strong> other Bidders presentingsubstantially responsive Bids.26.3 If a Bid is not substantially responsive, it will be rejected by the Employer, and may notsubsequently be made responsive by correction or withdrawal <strong>of</strong> the non-conforming deviation orreservation.27. Correction <strong>of</strong> Errors27.1 Bids determined to be substantially responsive will be checked by the Employer for any arithmeticerrors. Errors will be corrected by the Employer as follows:- where there is a discrepancy between the rates in figures and in words, the rate in words willgovern; and- Where there is a discrepancy between the unit rate and the line item total resulting fromMultiplying the unit rate by the quantity, the unit rate as quoted will govern.27.2 The amount stated in the Bid will be adjusted by the Employer in accordance with the aboveprocedure for the correction <strong>of</strong> errors and, with the concurrence <strong>of</strong> the Bidder, shall be consideredas binding upon the Bidder. If the Bidder does not accept the corrected amount the Bid will berejected, and the Bid security may be forfeited in accordance with Sub-Clause 16.6 (b).28. Deleted29. Evaluation and Comparison <strong>of</strong> Bids29.1 The Employer will evaluate and compare only the Bids determined to be substantially responsivein accordance with Clause 26.29.2 In evaluating the Bids, the Employer will determine for each Bid the evaluated Bid Price byadjusting the Bid Price as follows:(a)(b)making any correction for errors pursuant to Clause 27; ormaking an appropriate adjustments for any other acceptable variations, deviations; and(c) making appropriate adjustments to reflect discounts or other price modifications <strong>of</strong>feredin accordance with Sub Clause 22.5.29.3 The Employer reserves the right to accept or reject any variation, deviation, or alternative <strong>of</strong>fer.Variations, deviations, and alternative <strong>of</strong>fers and other factors which are in excess <strong>of</strong> theContractor EE 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!