13.07.2015 Views

PART 3 CONTRACT - Pmueinrip-binamarga.com

PART 3 CONTRACT - Pmueinrip-binamarga.com

PART 3 CONTRACT - Pmueinrip-binamarga.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bidding Documents for ESB-02Part 3 – ContractSection VIII. Special Conditions of ContractGCC 25.1GCC 26.1GCC 26.2GCC 27.1Responsibility for transportation of the Goods shall be as specified in theIncoterms.The inspections and tests shall be specified in Section VI. SupplyRequirements – Specifications: Article 3.08 Inspections and TestingThe Inspections and tests shall be conducted at: _________The liquidated damage shall be one seventh of one percent (0.70 %) ofthe Contract Price per week.GCC 27.1 The maximum amount of liquidated damages shall be: ten (10) %GCC 28.3GCC 28.5The period of validity of the Warranty shall be: 360 days from the date offinal delivery.For purposes of the Warranty, the place(s) of final destination(s) shall bethe location of erection of the bridgeThe period for repair or replacement shall be: 360 days.3-22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!