13.07.2015 Views

Installation Instructions - Snap-on Equipment

Installation Instructions - Snap-on Equipment

Installation Instructions - Snap-on Equipment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUN ELECTRIC CORPORATIONModel: MRC-312 / MRC-334SERIAL BUNIT SETUPPage: 1 of 5<str<strong>on</strong>g>Installati<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>Instructi<strong>on</strong>s</str<strong>on</strong>g>INSTALLATION MUST BE PERFORMEDBYQUALIFIED SUN PERSONNEL ONLYINSTALLATION OVERVIEW:_____________________________________________The <str<strong>on</strong>g>Installati<strong>on</strong></str<strong>on</strong>g> Procedures listed are for the MRC-312 Serial B / MRC-334 Serial B. The unit is shippedas a fully assembled unit, with the excepti<strong>on</strong> of the items as listed in the Parts & Accessories List pertester.PLEASE READ THESE INSTRUCTIONS COMPLETELY BEFORE SETTING UP UNIT!THIS UNIT MUST BE PLUGGED IN TO A PROPER AC OUTLET FORUNIT TO OPERATE CORRECTLY. REFER TO UNIT ID PLATE LOCATEDON BACK OF UNIT. EXTENSION CORDS ARE NOT RECOMMENDED,BUT IF AN EXTENSION CORD MUST BE USED, USE A CORD THAT ISLESS THAN 50 FEET WITH A 16 AWG, OR ABOVE 50 FEET AND LESSTHAN 100 FEET WITH A 14 AWG.!USE STANDARD REFRIGERANT HANDLINGSAFETY PROCEDURES WHEN PERFORMING INSTALLATIONALWAYS WEAR SAFETY GOGGLES, DON’T SPILL OR TOUCH LIQUIDREFRIGERANT, AVOID FLAMES, AND EXCESSIVE HEAT. USE ONLY INWELL VENTILATED AREA.0692-2318-01 (06/03/97) REV. E


Page 3 of 5PARTS & ACCESSORIES SETUP: ________________________________________1. Remove the Gauge Set Assembly (EAH0013C00A or EAC0014C00A) from the gauge set boxand place it in the top tray.2. Remove the Blue and Red Hoses from the gauge set box and OIL the seals <strong>on</strong> each end.3. C<strong>on</strong>nect the open end of the Blue and Red Hoses to the Gauge Set respectively.4. For the MRC-312, place the four adapters in the Storage Compartment <strong>on</strong> top of unit.5. For the MRC-334, c<strong>on</strong>nect the Red and Blue adapters (0647-0287-09 and 0647-0287-10) to theRed and Blue Hoses from the Gauge Set respectively.6. For the MRC-334, place the O-Ring Kit (ARG04040) in the Storage Compartment <strong>on</strong> top of unit.7. Remove the User's Manual from the Literature Kit, and place the remainder of the Literature Kit(0119-0369-01 or 0119-0370-01) in the Storage Compartment <strong>on</strong> top of unit.BE SURE TO REVIEW THE USER'S MANUAL WITH THE CUSTOMER DURING TRAINING.Then before installing the User's Manual Envelope, ask where the customer would likethe envelope installed. There is also a Video Tape (0693-2011 -01 or 0693-2012-01)supplied and can be viewed at the customer's c<strong>on</strong>venience.8. Peel the backing from the User's Manual Envelope (4211-0001-01) and apply the envelope, withthe open end <strong>on</strong> top, to either side of the unit or in the locati<strong>on</strong> designated by the customer.9. Place the User's Manual in the Envelope.10. Remove Recovery Tank (7009-2447-01 or 7009-2447-03) from box. Remove cardboard wrapfrom Recovery Tank. Set <strong>on</strong> floor in fr<strong>on</strong>t of unit.PREPARING NEW RECOVERY TANK: _____________________________________1. Open BLUE valve <strong>on</strong> Recovery Tank to release ALL COMPRESSED AIR.2. Remove the Inline Particle Filter from Recovery Tank. OIL seal, and re-attach to RecoveryTank. (BLUE SIDE)3. Remove the Yellow Hose from the gauge set box. OIL the seals <strong>on</strong> each end of hose.4. Attach open end of Yellow Hose to BLUE valve of Recovery Tank. Attach other end of YellowHose to service port <strong>on</strong> fr<strong>on</strong>t of unit. Open ball valve <strong>on</strong> yellow hose.!THIS UNIT MUST BE PLUGGED IN TO A PROPER AC OUTLET FORUNIT TO OPERATE CORRECTLY. REFER TO UNIT ID PLATELOCATED ON BACK OF UNIT. EXTENSION CORDS ARE NOTRECOMMENDED, BUT IF AN EXTENSION CORD MUST BE USED, USEA CORD THAT IS LESS THAN 50 FEET WITH A 16 AWG, OR ABOVE 50FEET AND LESS THAN 100 FEET WITH A 14 AWG.5. Plug AC Cord to a 115VAC outlet. Turn unit <strong>on</strong> using the fr<strong>on</strong>t power switch.0692-2318-01 (06/03/97) REV. E


Page 4 of 5PREPARING NEW RECOVERY TANK c<strong>on</strong>tinued:6. Press and program a 10 minute vacuum time by pressing twice andthen pressing 5 times. (This programs 0 for remainingparameters.)7. Once completed close Recovery Tank valve (BLUE) and remove Yellow Hose from RecoveryTank.8. Re-OIL seal <strong>on</strong> Yellow Hose and c<strong>on</strong>nect to center port <strong>on</strong> Gauge Set.9. Place Recovery Tank <strong>on</strong> scale. Tank fittings should face straight out the back of unit. C<strong>on</strong>nectvelcro strap and tighten belt.10. Remove bubble wrap from Red and Blue Hoses <strong>on</strong> unit11. OIL seals <strong>on</strong> the anti-blow back valves <strong>on</strong> Red and Blue Hoses from unit. C<strong>on</strong>nect respectivelyto Recovery Tank.PARAMETER SETUP: __________________________________________________1. Press twice to display amount of refrigerant in Recovery Tank. If amount is morethan 3 ounces in an empty tank, perform sequence A through C.A. Press and at the same time while the amount ofrefrigerant is being displayed.B. Press or to change the amount of refrigerant to 1oz. or until it togglesbetween 0 and 1 oz.C. Press to return to normal operati<strong>on</strong>.2. Press and hold and for 5 sec<strong>on</strong>ds. Refrigerant charge type will be displayed.3. If the display shows the incorrect type of refrigerant that is going to be dedicated for this unit,stop and call service.1-800-CALL-SUN4. Press or to change CHARGE parameters to “LbOz”, “kg”, “Lb”, “Oz”. Press to save the desired CHARGE parameters.5. Press or to change AMOUNT parameters to “LbOz”, or “kg”. Press to save the desired AMOUNT parameters.CALIBRATION:________________________________________________________1. Close Red Valve <strong>on</strong> Recovery Tank.2. Press and hold for five sec<strong>on</strong>ds until LCD displays “CAL”. Tankic<strong>on</strong> should be flashing.3. Press again to start calibrati<strong>on</strong>. “In Progress” will be displayed.This will take 3 minutes to complete.4. Up<strong>on</strong> completi<strong>on</strong> of the calibrati<strong>on</strong>, temperature will be displayed. Press twice.0692-2318-01 (06/03/97) REV. E


Page 5 of 5CHARGING RECOVERY TANK: __________________________________________NOTE: THIS PROCEDURE IS USED TO SETUP THE UNIT FOR CHARGING. RECOVERY TANKSHOULD HAVE AT LEAST A 25” VACUUM.1. Be sure Recovery Tank valves are closed.2. Disc<strong>on</strong>nect the Red and Blue hoses from the Recovery Tank.3. Disc<strong>on</strong>nect and Re-Oil both the seals <strong>on</strong> Yellow hose. C<strong>on</strong>nect the Yellow Hose with the openend to a Virgin Tank.4. C<strong>on</strong>nect the other end of the Yellow Hose to the Red Valve <strong>on</strong> the Recovery Tank.5. Open the Red Valve <strong>on</strong> the Recovery Tank.!USE STANDARD REFRIGERANT HANDLINGSAFETY PROCEDURES WHEN PERFORMING INSTALLATIONALWAYS WEAR SAFETY GOGGLES, DON’T SPILL OR TOUCH LIQUIDREFRIGERANT, AVOID FLAMES, AND EXCESSIVE HEAT. USE ONLY INWELL VENTILATED AREA.6. Invert the Virgin Tank and open valve. If a Hand Valve is present <strong>on</strong> the Yellow Hose, open toallow the refrigerant to flow.7. Raise the Virgin Tank to a higher level than the Recovery Tank. Gravity and vacuum willtransfer the liquid refrigerant to the Recovery Tank faster than reclaiming it.8. Press twice to display the amount of refrigerant that has been transferred.9. After the desired amount of refrigerant has been transferred, close valves <strong>on</strong> Virgin Tank andRecovery Tank. Set Virgin Tank <strong>on</strong> ground upright.10. Close Hand Valve <strong>on</strong> Yellow Hose if present. Disc<strong>on</strong>nect Yellow Hose from Recovery Tank.11. Re-Oil seals <strong>on</strong> anti-blow back valves <strong>on</strong> Red and Blue Hoses from unit and c<strong>on</strong>nect toRecovery Tank. Open Recovery Tank valves.12. Re-Oil seals <strong>on</strong> Yellow Hose and c<strong>on</strong>nect to service port <strong>on</strong> fr<strong>on</strong>t of unit. Open Hand Valve <strong>on</strong>Yellow Hose if present.13. Press . This will reclaim the refrigerant from the hose. (Opti<strong>on</strong>al: OpeningVirgin Tank valve will reclaim rest of refrigerant.)14. Once complete, disc<strong>on</strong>nect Yellow Hose from Virgin Tank.15. Re-Oil seals <strong>on</strong> Yellow Hose and c<strong>on</strong>nect to center port <strong>on</strong> Gauge Set.INSTALLATION COMPLETE/SETUP COMPLETEREMEMBER TO OIL O-RINGS AND SEALSWHEN ATTACHING HOSES OR FITTINGS0692-2318-01 (06/03/97) REV. E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!