13.07.2015 Views

instrucţiune de funcţionare (2.0 MB)

instrucţiune de funcţionare (2.0 MB)

instrucţiune de funcţionare (2.0 MB)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

english6. Installation6.3 Possible methods of installation6.1 ErectionThe pump must be erected in a frost-free and wellventilatedroom.CautionIn plants for pumping hot media, makesure that people cannot acci<strong>de</strong>ntally comeinto contact with hot surfaces.A minimum clearance is required above the motorfor inspection and for repairs:– For pumps with motors up to and including4 kW: 300 mm.– For pumps with motors over 5.5 kW, a space ofat least 1 m should be provi<strong>de</strong>d by the customerfor a block and tackle.Vertical installationLVLVV1CautionMotors and pump head (motor and impeller)alone may be lifted by the suspensionshackles (if present).V2The whole pump must not be lifted by thesuspension shackles. The suspensionshackles are not sufficiently stronglydimensioned for this purpose.LVSpace above the motor0.25 to 4.0 kW 5.5 to 18.5 kWV1aHorizontal installationLV6.2 ConnectionThe arrows on the pump casing show the directionof flow of the medium.Depending on the motor size, the pump can beinstalled in horizontal or vertical pipework. Pumpswith motors up to and including 7,5 kW may beinstalled in all positions, but the motor must notpoint downwards.LVH1LVLVCautionLV vent, in<strong>de</strong>pen<strong>de</strong>ntly of the direction ofinstallation, always in the vertical axis atthe top. Exception: H1 and H1aH2H3LVH1a19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!