13.07.2015 Views

Vita - The University of Tennessee, Knoxville

Vita - The University of Tennessee, Knoxville

Vita - The University of Tennessee, Knoxville

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20. J.W. Hines, J. Coble, and B.R. Upadhyaya, “Application <strong>of</strong> Monitoring and Prognostics toSmall Modular Reactors,” Proceedings <strong>of</strong> the 2 nd Future <strong>of</strong> Instrumentation InternationalWorkshop, ORNL, Oak Ridge, TN, November 2011.21. C. Morrow, B.R. Upadhyaya, and J. March-Leuba, “<strong>The</strong>rmal Camera Imaging for SecurityMonitoring <strong>of</strong> GCEP Systems,” Transactions <strong>of</strong> the American Nuclear Society, Washington,D.C., Vol. 105, November 2011.22. B.R. Upadhyaya, F. Li, S.R.P. Perillo, and J.W. Hines, “Control, Co-generation, and SensorPlacement for Integral Small Modular Reactors,” Proceedings <strong>of</strong> ICI 2011, Daejeon,Republic <strong>of</strong> Korea, August 2011.23. J. Sun, H. Liao, and B.R. Upadhyaya, “Sensor Data Recovery in an Asynchronous ConditionMonitoring Environment,” Transactions <strong>of</strong> the American Nuclear Society, Vol. 104, pp. 535-536, Hollywood, FL, June 2011.24. B.R. Upadhyaya, T. Woldemichael, J.W. Hines, and F. Lipinski, “Analysis <strong>of</strong> NuclearPerformance Database for Equipment Monitoring and Prognosis,” Proceedings <strong>of</strong> MARCON2011, <strong>Knoxville</strong>, TN, March 2011.25. F. Li and B.R. Upadhyaya, “Development <strong>of</strong> an Optimal Sensor Placement Strategy forNuclear Power Systems,” Proc. <strong>of</strong> NPIC&HMIT 2010, Las Vegas, NV, pp. 153-165,November 2010.26. S.R.P. Perillo and B.R. Upadhyaya, “Dynamic Modeling and Control Strategy for Multi-Modular Integral Pressurized Water Reactors,” Proc. <strong>of</strong> NPIC&HMIT 2010, Las Vegas, NV,pp. 190-199, November 2010.27. J. Coble, J.W. Hines, and B.R. Upadhyaya, “Application <strong>of</strong> Failure Prognostics to the IRISPlant,” Proc. <strong>of</strong> NPIC&HMIT 2010, Las Vegas, NV, pp. 213-225, November 2010.28. S. Seker, B.R. Upadhyaya, T. Senguler, and A.H. Kayran, “Redundant Continuous WaveletTransform for Fault Detection and Diagnosis,” Proc. <strong>of</strong> NPIC&HMIT 2010, Las Vegas, NV,pp. 264-272, November 2010.29. J. March-Leuba, T. Uckan, P. Brukiewa, and B.R. Upadhyaya, “UF6 Flow Measurements inGCEPs Through Passive Monitoring <strong>of</strong> Process Equipment,” ANS Transactions, Las Vegas,NV, Vol. 103, pp. 140-141, November 2010.30. T. Uckan, J.A. March-Leuba, P. Brukiewa, and B.R. Upadhyaya, “Spectral Multi-peakAnalysis Methodology for Eliminating Effects <strong>of</strong> NaI Temperature Drift,” Proceedings <strong>of</strong>INMM Annual Meeting, Baltimore, MD, July 2010.31. B.R. Upadhyaya and J.W. Hines, “Fault Monitoring in Sensor Networks and SensorPlacement Strategy for Nuclear Desalination Systems,” 24 th International Forum on ProcessAnalytical Technology, IFPAC-2010, pp. 78-79, Baltimore, MD, January 2010.32. P. Brukiewa, B.R. Upadhyaya, S. Revis, J. March-Leuba, T. Uckan, and J.E. Gunning,“Development <strong>of</strong> a Consistent Model to Define the 186 keV Count Rate from 235U SpectralMeasurements,” Transactions <strong>of</strong> the American Nuclear Society, Vol. 101, pp. 210-211,3


November 2009.33. S. Revis, P. Brukiewa, B.R. Upadhyaya, J. March-Leuba, T. Uckan, and J.E. Gunning,“Benchmark <strong>of</strong> Passive UF6 Measurements and Extrapolation Methodology for CalibratingSafeguards Instruments,” Transactions <strong>of</strong> the American Nuclear Society, Vol. 101, p. 213,November 2009.34. M. Humberstone, J. Henkel, J.W. Hines, and B.R. Upadhyaya, “An Adaptive Model forCondition Monitoring Applications,” Transactions <strong>of</strong> the American Nuclear Society, Vol.101, pp. 299-300, November 2009.35. S.R.P. Perillo, B.R. Upadhyaya, and J.W. Hines, “On-line Fault Detection in an ExperimentalFlow Loop and Digital Control Applications,” Transactions <strong>of</strong> the American Nuclear Society,Vol. 101, pp. 305-306, November 2009.36. X. Xu and B.R. Upadhyaya, “Analysis <strong>of</strong> Robustness <strong>of</strong> Model-Predictive Controller for theIRIS Helical Coil Steam Generator,” Transactions <strong>of</strong> the American Nuclear Society, Vol.101, pp. 317-319, November 2009.37. B.R. Upadhyaya, S.R.P. Perillo, X. Xu, F. Li, “Advanced Control Design, Optimal SensorPlacement, and Technology Demonstration for Small and Medium Nuclear Power Reactors,”Proceedings <strong>of</strong> ICONE 17, Brussels, Belgium, July 2009.38. F. Li, B.R. Upadhyaya, and J.W. Hines, “Optimal Sensor Placement Strategy for the SteamGenerator System in an Integral Pressurized Water Reactor,” Transactions <strong>of</strong> the AmericanNuclear Society, Vol. 100, pp. 213-214, Atlanta, June 2009.39. F. Li and B.R. Upadhyaya, “Sensor Placement Design in a Nuclear Plant Based on FaultDiagnostic Observability and Reliability Criteria,” Proceedings <strong>of</strong> MARCON 2009,<strong>Knoxville</strong>, TN, May 2009.40. F. Li and B.R. Upadhyaya, “Design <strong>of</strong> Sensor Placement for the IRIS Reactor Using FaultDiagnostic Observability and Reliability Criteria,” Proceedings <strong>of</strong> the 6 th ANS InternationalTopical Meeting on Nuclear Plant Instrumentation, Control, and Human Machine InterfaceTechnologies, <strong>Knoxville</strong>, TN, April 2009.41. S.R.P. Perillo and B.R. Upadhyaya, “Digital Control Implementation in an ExperimentalFlow Control Loop With Applications to Small and Medium Reactors,” Proceedings <strong>of</strong> the6 th ANS International Topical Meeting on Nuclear Plant Instrumentation, Control, andHuman Machine Interface Technologies, <strong>Knoxville</strong>, TN, April 2009.42. X. Xu and B.R. Upadhyaya, “Multivariable Control Design for the IRIS Primary SystemUsing the Model Predictive Control Approach,” Proceedings <strong>of</strong> the 6 th ANS InternationalTopical Meeting on Nuclear Plant Instrumentation, Control, and Human Machine InterfaceTechnologies, <strong>Knoxville</strong>, TN, April 2009.43. J.W. Hines, B.R. Upadhyaya, and J.J. Henkel, “Process Monitoring Techniques Applied toEnrichment Monitoring,” Proceedings <strong>of</strong> the 6 th ANS International Topical Meeting onNuclear Plant Instrumentation, Control, and Human Machine Interface Technologies,<strong>Knoxville</strong>, TN, April 2009.4


44. J. March-Leuba, T. Uckan, J. Gunning, P. Brukiewa, and B.R. Upadhyaya, “UF6 Mass FlowMeasurement in Gas Centrifuge Enrichment Plants Using Passive Process Monitoring,”Proceedings <strong>of</strong> the 6 th ANS International Topical Meeting on Nuclear Plant Instrumentation,Control, and Human Machine Interface Technologies, <strong>Knoxville</strong>, TN, April 2009.45. D.E. Holcomb, B.R. Upadhyaya, R.A. Kisner, J. O’Hara, E.L. Quinn, and D.W. Miller,“Instrumentation, Control, and Human-Machine Interface Technology DevelopmentRoadmap in Support <strong>of</strong> Grid Appropriate Reactors,” Proceedings <strong>of</strong> the 6 th ANS InternationalTopical Meeting on Nuclear Plant Instrumentation, Control, and Human Machine InterfaceTechnologies, <strong>Knoxville</strong>, TN, April 2009.46. B.R. Upadhyaya et al., “Instrumentation, Controls, and Human-Machine InterfaceTechnology Development Roadmap in Support <strong>of</strong> Grid Appropriate Reactors,” Proceedings<strong>of</strong> ISSNP2008, Harbin, People’s Republic <strong>of</strong> China, pp. 123-129, September 2008.47. E. Ayaz, M. Ucar, S. Seker, and B.R. Upadhyaya, “Signal Based Fault Detection for StatorInsulation in Electric Motors,” Proceedings <strong>of</strong> Universities Power Engineering Conference(UPEC 2008), Padova, Italy, September 2008.48. J.W. Hines and B.R. Upadhyaya, "A <strong>The</strong>oretical Framework for Proliferation ResistantProcesses," Proceedings <strong>of</strong> the INMM 49 th Annual Meeting, Nashville, TN, July 2008.49. B.R. Upadhyaya and X. Xu, “Design <strong>of</strong> a Model Predictive Controller for the IRIS HelicalCoil Steam Generator,” Transactions <strong>of</strong> the American Nuclear Society, Anaheim, CA, Vol.98, pp. 90-92, June 2008.50. J.W. Hines, J. Henkel, and B.R. Upadhyaya, “Process Monitoring Techniques Applied toNuclear Nonproliferation,” Proceedings <strong>of</strong> the 8 th International Conference on FacilityOperations-Safeguards Interface (INMM), Portland, Oregon, March-April 2008.51. B.R. Upadhyaya, F. Li, R. Kephart, and L.A. C<strong>of</strong>fey, “Application <strong>of</strong> Data-BasedPerformance Monitoring Methods to Process Units <strong>of</strong> Fossil Power Plants,” Proceedings <strong>of</strong>MARCON 08, <strong>Knoxville</strong>, TN, May 2008.52. B.R. Upadhyaya, J.T. Kim et al., Development <strong>of</strong> Diagnostics and Prognostics Methods forSustainability <strong>of</strong> Nuclear Power Plant Safety Critical Functions, Annual Report prepared forthe DOE I-NERI Project-ROK, 2011-004-K, November 2012.53. J.B. Coble, P. Ramuhalli, L.J. Bond, J.W. Hines, and B.R. Upadhyaya, Prognostics andHealth Management in Nuclear Power Plants: A Review <strong>of</strong> Technologies and Applications,Prepared for the U.S. DOE by Pacific Northwest National Laboratory, PNNL-21515, July2012.54. J.W. Hines, B.R. Upadhyaya et al., Advanced Instrumentation and Control Methods for Smalland Medium Reactors with IRIS Demonstration, Vol. 1: Executive Summary. Final Reportprepared for the U.S. Department <strong>of</strong> Energy, <strong>University</strong> <strong>of</strong> <strong>Tennessee</strong>. Report No. DE-FG07-07ID14895/UTNE/2011-3, May 2011.55. B.R. Upadhyaya, R.E. Edwards, X. Xu, Y Guo, and X. Jin, Advanced Instrumentation andControl Methods for Small and Medium Reactors with IRIS Demonstration, Vol. 3:Development <strong>of</strong> an Autonomous and Fault-tolerant Control Method with Applications to theIRIS System. Final Report prepared for the U.S. Department <strong>of</strong> Energy, <strong>University</strong> <strong>of</strong>5


<strong>Tennessee</strong>. Report No. DE-FG07-07ID14895/UTNE/2011-5, May 2011.56. B.R. Upadhyaya and F. Li, Advanced Instrumentation and Control Methods for Small andMedium Reactors with IRIS Demonstration, Vol. 4: Dynamic Modeling, Sensor PlacementDesign, and Fault Diagnosis <strong>of</strong> Nuclear Desalination Systems. Final Report prepared for theU.S. Department <strong>of</strong> Energy, <strong>University</strong> <strong>of</strong> <strong>Tennessee</strong>. Report No. DE-FG07-07ID14895/UTNE/2011-6, May 2011.57. B.R. Upadhyaya and S.R.P. Perillo, Advanced Instrumentation and Control Methods forSmall and Medium Reactors with IRIS Demonstration, Vol. 5: Multi-modular IntegralPressurized Water Reactor Control and Operational Reconfiguration for a Flow ControlLoop. Final Report prepared for the U.S. Department <strong>of</strong> Energy, <strong>University</strong> <strong>of</strong> <strong>Tennessee</strong>.Report No. DE-FG07-07ID14895/UTNE/2011-7, May 2011.58. J.W. Hines, B.R. Upadhyaya et al., Health Management and Prognostics Applications forAircraft Systems and Equipment, Final Report prepared for Global Strategic Solutions,<strong>University</strong> <strong>of</strong> <strong>Tennessee</strong>. February 2011.59. J.W. Hines, B.R. Upadhyaya et al., Advanced Instrumentation and Control Methods for Smalland Medium Reactors with IRIS Demonstration, Annual Report prepared for the U.S.Department <strong>of</strong> Energy, Report No. DE-FG07-07ID14895/UTNE/2010-4, October 2010.60. J. March-Leuba, T. Uckan, P.D. Brukiewa, and B.R. Upadhyaya, UF6 Flow Measurements inGCEPs through Passive Monitoring <strong>of</strong> Process Equipment, Oak Ridge National Laboratory,ORNL/TM-2010/192, September 2010.61. B.R. Upadhyaya and N. Lambert, On-Line Monitoring, Prognostics, and RecentDevelopments in Digital Instrumentation and Controls in the Nuclear Power Industry,Annual Report prepared for Entergy Nuclear, <strong>University</strong> <strong>of</strong> <strong>Tennessee</strong>, July 2010.62. J. March-Leuba, T. Uckan, J.E. Gunning, S. Revis, P.D. Brukiewa, and B.R. Upadhyaya,Benchmark Gamma Spectroscopy Measurements <strong>of</strong> UF6 in an Aluminum Pipe with a NaIDetector, ORNL/TM-2009/148, November 2009.63. J.W. Hines, B.R. Upadhyaya et al., Advanced Instrumentation and Control Methods for Smalland Medium Reactors with IRIS Demonstration, Annual Report prepared for the U.S.Department <strong>of</strong> Energy, Report No. DE-FG07-07ID14895/UTNE/2009-4, October 2009.64. B.R. Upadhyaya et al., Digital Instrumentation and Controls, Field Programmable GateArrays, and Nuclear Plant Monitoring, Annual Report prepared for Entergy Nuclear,UTNE/Entergy/2009-01, September 2009.65. J.W. Hines, B.R. Upadhyaya et al., Advanced Instrumentation and Control Methods for Smalland Medium Reactors with IRIS Demonstration, Annual Report prepared for the U.S.Department <strong>of</strong> Energy, Report No. DE-FG07-07ID14895/UTNE/2008-4, October 2008.66. B.I. Mattison and B.R. Upadhyaya, Development <strong>of</strong> a Graphical User Interface for aDynamic Model <strong>of</strong> a Pressurized Water Reactor Plant, Research Report, <strong>The</strong> <strong>University</strong> <strong>of</strong><strong>Tennessee</strong>, <strong>Knoxville</strong>, Report No. UTNE/BRU/2008-01, August 2008.67. C.J. Denyer and B.R. Upadhyaya, <strong>The</strong> International Atomic Energy Agency and the6


Safeguarding Process, Research Report, <strong>The</strong> <strong>University</strong> <strong>of</strong> <strong>Tennessee</strong>, <strong>Knoxville</strong>, Report No.UTNE/BRU/2008-02, August 2008.68. D.E. Holcomb, B.R. Upadhyaya, R.A. Kisner, J. O’Hara, D.D. Dudenhoeffer, E.L. Quinn,D.W. Miller, R.T. Wood, and S.R. Perillo, Instrumentation, Controls, and Human-MachineInterface Technology Development Roadmap for Grid-Appropriate Reactors, Prepared forthe DOE Office <strong>of</strong> Nuclear Energy by Oak Ridge National Laboratory, ORNL-GNEP-LTR-2008-041, June 2008.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!