13.07.2015 Views

SYSTEM REQUIREMENTS DOCUMENT (SRD) - Air Force Freedom ...

SYSTEM REQUIREMENTS DOCUMENT (SRD) - Air Force Freedom ...

SYSTEM REQUIREMENTS DOCUMENT (SRD) - Air Force Freedom ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Global Broadcast Service (GBS)Volume VI – Model Contract – Attachment 3<strong>SRD</strong> ID <strong>SRD</strong> Requirement ORD Req # ORD Requirement2150221503The GBS System Monitoring Service, with respect to GBSUsage Statistics, shall include historical informationparameters, but are not limited to, broadcast type (e.g. video,streaming packet, files), rebroadcast requests, and by user pullrequests. [<strong>SRD</strong> ID 21502] 12, 28, 29The GBS System Monitoring Service, with respect to GBSUsage Statistics, shall provide the ability to generate, in theSecret enclave, a merged usage statistical report on a dailybasis. [<strong>SRD</strong> ID 21503] 28,29Req 12: The GBS system shall provide, through automated tools, the capability to fulfill “userpull” requests from authorized users and shall provide the means for users to identify specific ad-hocinformation needs. User pull requests shall be fulfilled on the broadcast through current or held forfuture broadcast coverage areas. “User pull” requests shall be capable of using receive suite attachednetwork connectivity or TRS RCS connectivity for automated information retrieval and broadcast(Block-2 Threshold). Req 28: The SBM and TSBM shall be capable of automated interface withIDM capabilities to provide a unified mechanism for GBS users, information providers, and TIM tomonitor the efficiency and content flow of the GBS broadcast (Block-3 Threshold). Req 29: TheSBM and TSBM shall provide an automated interface integrated with IDM for managing portions ofbroadcast content and priorities, and interacting with IDM tools to assist TIM in efficient broadcastplanning (Block-3 Threshold).Req 28: The SBM and TSBM shall be capable of automated interface with IDM capabilities toprovide a unified mechanism for GBS users, information providers, and TIM to monitor theefficiency and content flow of the GBS broadcast (Block-3 Threshold). Req 29: The SBM andTSBM shall provide an automated interface integrated with IDM for managing portions of broadcastcontent and priorities, and interacting with IDM tools to assist TIM in efficient broadcast planning(Block-3 Threshold).2160121602The NETOPS Reporting Services shall provide selectableelements from the Current SBM Status monitoring service tothe DISN Integrated Network Management System (INMS).[<strong>SRD</strong> ID 21601] 163The NETOPS Reporting Services shall provide selectableelements from the Current RBM Status monitoring service tothe DISN Integrated Network Management System (INMS).[<strong>SRD</strong> ID 21602] 163Req 163: GBS BMS shall implement network management to enhanced integration with TheaterCommunications Coordination Center (TCCC) through reporting of real time GBS allocationsaccording to operations being supported (Block-3 Threshold, Block-2 Objective).Req 163: GBS BMS shall implement network management to enhanced integration with TheaterCommunications Coordination Center (TCCC) through reporting of real time GBS allocationsaccording to operations being supported (Block-3 Threshold, Block-2 Objective).21700The NETOPS Reporting Services shall provide a capability forclient access to the RNOSC INMS system for the purpose ofreceiving and viewing INMS network maps. [<strong>SRD</strong> ID 21700] 163Req 163: GBS BMS shall implement network management to enhanced integration with TheaterCommunications Coordination Center (TCCC) through reporting of real time GBS allocationsaccording to operations being supported (Block-3 Threshold, Block-2 Objective).218002190022000The NETOPS Reporting Services shall provide the capabilityto filter and report GBS system trouble tickets to the TroubleManagement System (TMS). [<strong>SRD</strong> ID 21800] 163The Uplink Modulator Planning Services shall allow a GBSoperational manager or TIM to manually associate specificRBMs with uplink modulators on all GBS satellites (WGS,UFO, commercial, etc.). [<strong>SRD</strong> ID 21900] 81The Uplink Modulator Planning Services shall provide thecapability to process the Satellite Access Authorization (SAA)and configure the system to the expected satelliteconfiguration. [<strong>SRD</strong> ID 22000] 81Req 163: GBS BMS shall implement network management to enhanced integration with TheaterCommunications Coordination Center (TCCC) through reporting of real time GBS allocationsaccording to operations being supported (Block-3 Threshold, Block-2 Objective).Req 81: GBS shall use WGS satellites in complement with the UFO GBS to provide space segmentresources with interoperable transponder coverage at Ka-band and X-band (KPP – Block-2Threshold). The SBM shall manage the broadcast content for WGS coverage areas based upon asingle spot beam’s coverage for each unique broadcast injected (Block-2 Threshold).Req 81: GBS shall use WGS satellites in complement with the UFO GBS to provide space segmentresources with interoperable transponder coverage at Ka-band and X-band (KPP – Block-2Threshold). The SBM shall manage the broadcast content for WGS coverage areas based upon asingle spot beam’s coverage for each unique broadcast injected (Block-2 Threshold).30 March 2009 • Contract Number: FA8726-09-C-0006Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposalVolume VI-5.0-205

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!