13.07.2015 Views

SYSTEM REQUIREMENTS DOCUMENT (SRD) - Air Force Freedom ...

SYSTEM REQUIREMENTS DOCUMENT (SRD) - Air Force Freedom ...

SYSTEM REQUIREMENTS DOCUMENT (SRD) - Air Force Freedom ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Global Broadcast Service (GBS)Volume VI – Model Contract – Attachment 3<strong>SRD</strong> ID <strong>SRD</strong> Requirement ORD Req # ORD Requirement1960019700The BDA shall automatically delete ingested files after aminimum of 3 days. [<strong>SRD</strong> ID 19600] 12The BDA shall store all ingested data files for at least 3 days toprovide the end users the ability to request file rebroadcast.[<strong>SRD</strong> ID 19700] 12Req 12: The GBS system shall provide, through automated tools, the capability to fulfill “user pull”requests from authorized users and shall provide the means for users to identify specific ad-hocinformation needs. User pull requests shall be fulfilled on the broadcast through current or held forfuture broadcast coverage areas. “User pull” requests shall be capable of using receive suite attachednetwork connectivity or TRS RCS connectivity for automated information retrieval and broadcast(Block-2 Threshold).Req 12: The GBS system shall provide, through automated tools, the capability to fulfill “user pull”requests from authorized users and shall provide the means for users to identify specific ad-hocinformation needs. User pull requests shall be fulfilled on the broadcast through current or held forfuture broadcast coverage areas. “User pull” requests shall be capable of using receive suite attachednetwork connectivity or TRS RCS connectivity for automated information retrieval and broadcast(Block-2 Threshold).19801199002000020001The BDA shall allow the SBM to automatically protect andstore queued information and systematically shut down afterloss or fluctuations of external power. [<strong>SRD</strong> ID 19801] 45The BDA shall process User Pull request based on current 14, 39, 43-4,broadcast profile priorities. [<strong>SRD</strong> ID 19900]161The GBS Network Management Software (NMS) shall becapable of automatically alerting local GBS operators ofchanges in SBM network element status or critical failures ofsystems that impact the broadcast of data via audible alarms,email, pages, and pop-up alarms in a manner consistent withthe rules of the security enclave that the NMS is managing.[<strong>SRD</strong> ID 20000] 2-1The BDA shall provide automated over-the-air (OTA) softwareand Information Assurance updates to GBS JPO procuredRBMs. [<strong>SRD</strong> ID 20001] 2-1Req 45: The SBM, and PIP shall have the ability to automatically protect and store queuedinformation and protect system equipment in order to logically and systematically shut down or torapidly resume broadcast operations after loss or fluctuations of external power (Threshold).Req 14: The manner in which the information provider and GBS system responds to user pullrequest shall permit either the delivery of requisite information directly to the user (Threshold) or asa broadcast service to a community of interest (COI), which the user subscribes when initiating therequest (Block-3 Threshold, Block-2 Objective). All members of the COI, based upon assignedpriority shall receive the user pull response. Req 39: The SBM and TSBM shall be capable ofreceiving “user pull” data on the return channel satellite. The SBM and TSBM shall be capable ofrouting the “user pull” data to selected sources (Block-3 Threshold). Req 43-4: Req 43-4: TheBFC shall implement “User-Pull” as a broadcast service to COI across multiple space segmentresources (Block-3 Threshold).. Req 161: BMS shall permit compartment and above US Secretinformation providers to control the broadcast stream based on user pull across SCI networks(Block-3 Threshold).Req 2-1: The GBS System shall be capable of automatically reporting the status of Transmit Suitetransport elements (e.g. switches & routers) to the DISN Integrated Network Management System99% (Block-3 Threshold) and 99.9% (Block-3 Objective) of the time. GBS shall have an automatednetwork management capability to obtain status of networks and associated assets.Req 2-1: The GBS System shall be capable of automatically reporting the status of Transmit Suitetransport elements (e.g. switches & routers) to the DISN Integrated Network Management System99% (Block-3 Threshold) and 99.9% (Block-3 Objective) of the time. GBS shall have an automatednetwork management capability to obtain status of networks and associated assets.2020020500The BDA shall respond to TIM authorized re-broadcastrequests based on current broadcast profile priorities and themissed files reports. [<strong>SRD</strong> ID 20200] 39The Operations Management Activity (OMA) shall provide theinformation and tools necessary for coordinating the use ofsatellite and uplink resources between the SBM, the TeleportSites, the UFO PIPs, RSSC, WSOC, and other entities sharingGBS resources. [<strong>SRD</strong> ID 20500]16 ,21, 21-1,21-2, 21-3, 4030 March 2009 • Contract Number: FA8726-09-C-0006Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposalVolume VI-5.0-200Req 39: The SBM and TSBM shall be capable of receiving “user pull” data on the return channelsatellite. The SBM and TSBM shall be capable of routing the “user pull” data to selected sources(Block-3 Threshold).Req 16: The SBM and TSBM shall generate the broadcast and adjust spot beam pointing to meetthe timeliness requirements of each product when taken in aggregate, within the constraints imposedon the broadcast by information product availability, the Combatant Commander’s disseminationpolicy, the user needs, the information priorities, and the satellite spot beam coverage (Threshold).Req 21: The GBS System shall permit frequent pointing of steerable GBS satellite spot beamantennas to cover mission specific requirements and geographically dispersed users. (KPP –Threshold). Req 21-1: The SBM shall be the primary means for tasking GBS dedicated steerable

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!