Name <strong>of</strong> the EmployerName <strong>of</strong> the Work: M/S.SOFTWARE TECHNOLOGY PARKS OF INDIA,CHENNAI.: SERVICE AND A.M.C FOR WET RISERSYSTEM,SPRINKLER, SYSTEM, FIRE ALARM, PUMP HOUSE,AND FIRE EXTINGUISHERS AT <strong>STPI</strong> OFFFICECUM INCUBATION CENTRE AT TARAMANI,CHENNAI. AT SOFTWARE TECHNOLLOGY PARKOF INDIA- TARAMANI, CHENNAITender issued to :Name :Address :Date <strong>of</strong> issue :Due date for submission <strong>of</strong> the tender by 12.00 HRS 06 th day <strong>of</strong> November 2008addressed to the Director, S<strong>of</strong>tware Technology Parks <strong>of</strong> <strong>India</strong>, No. 05 Rajiv Gandhi Sali,Taramani, <strong>Chennai</strong> 600113.Signature <strong>of</strong> Bidder Name :Designation :Address :Date :Tender_document_for_AMC_for_fire_fighting 3/25


NOTICE INVITING TENDERTo:Dear Sir/s:Sub: SERVICE AND A.M.C FOR WET RISERSYSTEM, SPRINKLER,SYSTEM, FIRE ALARM, PUMP HOUSE, AND FIRE EXTINGUISHERS.AT <strong>STPI</strong> OFFFICE CUM INCUBATION CENTRE AT TARAMANI,CHENNAI AT SOFTWARE ECHNOLLOGY PARK OF INDIATARAMANI”1. Contract documents comprising scope <strong>of</strong> the work, form <strong>of</strong> Tender, Conditions <strong>of</strong>Tender, Terms and Conditions, are forwarded herewith. The cost <strong>of</strong> document <strong>of</strong>Rs.500/-(non-refundable) may be sent to us by cheque/DD drawn in favor <strong>of</strong>SOFTWARE TECHNOLLOGY PARK OF INDIA, payable at <strong>Chennai</strong>.2. Please send all the papers, with the completed form <strong>of</strong> tender, the Conditions <strong>of</strong>tender and <strong>of</strong> contract, and scope <strong>of</strong> work, all duly signed at every page, before12.00 HRS on 6 th day <strong>of</strong> November 2008 in a sealed cover super scribedTENDER FOR SERVICE AND A.M.C FOR WET RISERSYSTEM,SPRINKLER, SYSTEM, FIRE ALARM, PUMP HOUSE, AND FIREEXTINGUISHERS AT <strong>STPI</strong> OFFFICE CUM INCUBATION CENTREAT TARAMANI, CHENNAI AT SOFTWARE TECHNOLLOGY PARKOF INDIA - TARAMANI, CHENNAI ” and addressed to The Director,S<strong>of</strong>tware Technology Parks <strong>of</strong> <strong>India</strong>, No. 05 Rajiv Gandhi Salai, Taramani<strong>Chennai</strong> 600113. No consideration will be given to the tender received by usafter the time above stipulated and no extension will be allowed forsubmission <strong>of</strong> tender.3. The tenders will be opened at the <strong>of</strong>fice <strong>of</strong> the Director, S<strong>of</strong>tware TechnologyParks <strong>of</strong> <strong>India</strong> No.05 Rajiv Gandhi Sali, Taramani <strong>Chennai</strong> 600113 Phone39103525 on 15.00 hrs on 6 th day <strong>of</strong> November 2008.4. Every tender shall be accompanied by Earnest Money Rs.5000/- (Rupees fivethousand only) in the form <strong>of</strong> Demand Draft from a Nationalized Bank drawn infavor <strong>of</strong> SOFTWARE TECHNOLOGY PARKS OF INDIA payable atCHENNAI. <strong>An</strong>y tender not accompanied by such Earnest Money is liable tobe rejected straightaway.5. The Earnest Money will be retained in the case <strong>of</strong> successful contractor as part <strong>of</strong>Tender_document_for_AMC_for_fire_fighting 4/25


the security for due fulfillment <strong>of</strong> the contract.6. The Security Deposit or Retention Money will bear no interest whatsoever7. The contractor shall submit his tender only after carefully examining the whole <strong>of</strong>the tender documents and the conditions <strong>of</strong> tender and <strong>of</strong> contract, scope <strong>of</strong> work,etc. Bidders are advised to inspect the site before quoting.8. All submission <strong>of</strong> Proposals must be signed by an authorized agent /representative<strong>of</strong> the company submitting the Proposal.9. This notice inviting tenders, the conditions <strong>of</strong> tender and the duly completed form<strong>of</strong> tender will form part <strong>of</strong> the agreement to be executed by the successfulcontractor with <strong>STPI</strong>.10. The <strong>STPI</strong> reserves the right to reject any or all the tenders without assigningreason there<strong>of</strong>.11. <strong>STPI</strong> reserves the right to receive and, if it thinks fit, to consider and accept a noncompliantproposal. The acceptance or rejection <strong>of</strong> a non-compliant proposal isentirely a matter for <strong>STPI</strong> in its absolute discretion.12. The work should be executed in coordination with other agencies that the <strong>STPI</strong>may employ to carry out items <strong>of</strong> work not covered in your tender.13. Where a proposal is incomplete or unclear in any respect, <strong>STPI</strong> may requestfurther supporting information to achieve satisfactory evaluation <strong>of</strong> the proposal.14. Tenders submitted shall remain open for acceptance for a period <strong>of</strong> sixty daysfrom the date <strong>of</strong> their opening. Should any contractor withdraw his tender beforethe expiry <strong>of</strong> the said period, makes modifications to his tender which are notacceptable to the Employer or refuses to execute the agreement within a stipulatedtime after the issue <strong>of</strong> the work order by the Employer he shall be liable to forfeitthe Earnest Money Deposit furnished by him.Yours faithfully,Tender_document_for_AMC_for_fire_fighting 5/25


1.0 ELIGIBILITY CONDITIONS1. Average annual financial turn over during the last 3 year ending 31 st March <strong>of</strong>previous year should be at least Rs 5 lakhs.2. Experience <strong>of</strong> having successfully completed similar works such as servicing andmaintenance <strong>of</strong> entire fire fighting system during the last 7 years ending last day<strong>of</strong> month previous to October 2008 should be either <strong>of</strong> the following.a) 3 similar completed works costing not less than Rs 1lakhb) 2 similar completed works costing not less than Rs 1.5 lakhc) 1 similar completed work costing not less than Rs 2 lakh.Documentary pro<strong>of</strong> for the above shall be produced along with the <strong>of</strong>fer. Failure <strong>of</strong>which <strong>of</strong>fer may be disqualified.2.0 TERMS AND CONDITIONS2.1 The agreement will be in force for one year from the date <strong>of</strong> execution <strong>of</strong>contract.2.2 There shall be 3 shifts and 8 hours duty per shift (Day or Night time) and theagency shall give weekly <strong>of</strong>f on the seventh day as per Rules. The agency shallprovide additional staff form the duties in shift on weekly <strong>of</strong>f days / on leave.2.3 The agency shall provide proper uniform consisting <strong>of</strong> full pants, shirts, shoes, ,torch lights, etc., to the staff2.4 The agency will be responsible for the discipline <strong>of</strong> the personnel employed bythem as per Conduct Rules and Regulations <strong>of</strong> <strong>STPI</strong>.2.5 The employees engaged by the agency will be in the employment <strong>of</strong> the agencyonly and not <strong>of</strong> the <strong>STPI</strong> <strong>of</strong>fice. The Agency will be responsible for payment <strong>of</strong>wage as Minimum Wages as prescribed / revised by Government and otherservice benefits to its personnel posted as mentioned below:a) Agency shall pay wages and other allowance to its staff not below therates <strong>of</strong> minimum wages fixed by the Government <strong>of</strong> <strong>India</strong> andGovernment <strong>of</strong> Tamil Nadu from time to time.b) Agency shall provide weekly holidays, National and Festival Holidays andleave with wages and other benefits as per the rules.Tender_document_for_AMC_for_fire_fighting 6/25


c) The Agency shall pay the gratuity and bonus as per the provisions <strong>of</strong> thePayment <strong>of</strong> Bonus Act, 1965 and Payment <strong>of</strong> Gratuity Act, 1972,including modifications up to date <strong>of</strong> tender.d) All other benefits required to be extended <strong>under</strong> various labour statutoryenactments.2.6 The Agency shall provide extra person if desired by the Office, during the period<strong>of</strong> this agreement2.7 Agency shall arrange subject to the provisions contained herein to safeguard the ,appliances, fittings materials and property <strong>of</strong> the <strong>STPI</strong>2.8 Only able bodied, physically fit, well-trained disciplined and honest personnelshall be appointed for duty. Persons so deployed shall not be below 25 years andabove 45 years. The names <strong>of</strong> the persons. Appointed / employed by the Agencyshall be intimated to <strong>STPI</strong> before commencing deployment. Frequent changes inthe manpower deployed will not be allowed. Agency shall also give the details <strong>of</strong>staff like age, qualification, residence address, performance track and other detailsrequired by <strong>STPI</strong>. They shall perform their duties to the satisfaction <strong>of</strong> the <strong>of</strong>fice..2.9 The agency shall be vigilant so that no person shall carry away any articlesbelonging to the <strong>of</strong>fices housed <strong>STPI</strong> out <strong>of</strong> its building.2.10 The Agency shall accept the responsibility for all acts or omission <strong>of</strong> itsemployees in relation to assets directly handed over .Agency shall be responsiblefor the loss if it is proved that the loss is due to the negligence on the part <strong>of</strong> staff.The extent <strong>of</strong> loss to be compensated by agency will be decided on merit by <strong>STPI</strong>which will be final. Agency shall pay such amount to <strong>STPI</strong>.2.11 The staff <strong>of</strong> the agency are in case found to be indulging in any undesirable orunfair activities in the premises <strong>of</strong> the <strong>of</strong>fice, the agency will solely be responsiblefor all the consequences apart from the liberty <strong>of</strong> department to lodge complaintsbefore appropriate authorities.2.12 <strong>STPI</strong> shall have the right to ask to the removal <strong>of</strong> any person <strong>of</strong> the agency <strong>of</strong> whois not considered to be orderly in discharge <strong>of</strong> his duties.2.13 Mode <strong>of</strong> payment will be quarterly and would be paid on 10 th <strong>of</strong> each succeedingquarter. Payments to the Agency will be through Account Payee cheques only.It is the responsibility <strong>of</strong> the Agency to produce previous months ESI, PFcontribution receipts and salary acquaintance as per the Minimum Wages Act<strong>of</strong> the employees along with the bill for payment. This will be strictlyadhered to before making payment <strong>of</strong> the current quarter.2.14 After the expiry <strong>of</strong> the agreement period, the service need not be continued takingit as deemed extension <strong>of</strong> period.Tender_document_for_AMC_for_fire_fighting 7/25


2.11 <strong>STPI</strong> has the right to impose fine and recover from the agency for noncompliance<strong>of</strong> the requirements. Decision <strong>of</strong> <strong>STPI</strong> will be final.2.12 <strong>An</strong>y dispute arising out <strong>of</strong> this agreement or that which may arise in future, willbe resolved by taking recourse to mutual settlement in the instance, failing whichthe dispute will be subject to <strong>Chennai</strong> Jurisdiction only. <strong>STPI</strong> is entitled towithhold payments due to the Agency in case <strong>of</strong> dispute <strong>of</strong> claims till it isresolved.2.13 The Agency shall strictly comply with the terms and conditions <strong>of</strong> agreement. Incase <strong>of</strong> violation <strong>of</strong> any <strong>of</strong> the terms, the agreement shall be liable for cancellationimmediately.Tender_document_for_AMC_for_fire_fighting 8/25


A) Technical Bid:1. Turnover for last three years(Copies <strong>of</strong> I.T. returns, P & L A/c and balance sheet to be enclosed)Financial Year Turn over Supporting Document2. Whether the agency is in the field <strong>of</strong> AMC for similar systems for last 3 years? Ifyes, the names <strong>of</strong> clients (Please enclosed pro<strong>of</strong>), also please mention the details<strong>of</strong> running contracts.Sl.No.YearName <strong>of</strong> the client with theaddress and contact numberContractValuePro<strong>of</strong>submitted3. Certificates <strong>of</strong> Satisfactory completion <strong>of</strong> above mentioned work may besubmitted. If it is noticed that any client did not find the work carried outsatisfactory, the tenders <strong>of</strong> such bidders will be treated as invalid.4. Details <strong>of</strong> infrastructure and training facilities (e.g. <strong>of</strong>fices, No. <strong>of</strong> employeesetc.,) available with bidder.5. Mention the registration number, if the Agency / Company are registered <strong>under</strong>Provident Fund Act, ESI and shops and Establishments Act. Copy <strong>of</strong> Registrationpapers along with code numbers attached to the Agency / company may beprovided.6. Please specify in details the arrangements that will be made to provide efficientservice.7. Income tax PAN No shall be intimated.I certify that all the terms and conditions <strong>of</strong> the tender documents are acceptable to us.Name:Designation:Signature <strong>of</strong> the authorized person.Date:Place:Company Seal:Tender_document_for_AMC_for_fire_fighting 9/25


B. Financial Bid1. Name, address & Contact No. Of the concern:2. Rate shall include cost <strong>of</strong> transportation <strong>of</strong> staff from agency <strong>of</strong>fice to site etc.Monthly ChargesService ChargesTotalRs.Rs.Rs.I certify that all the terms and conditions <strong>of</strong> the tender documents are acceptable to us.Signature <strong>of</strong> the authorized person.Name:Designation:Company Seal:Date:Place:Tender_document_for_AMC_for_fire_fighting 10/25


Earnest money <strong>of</strong> Rs.5,000/- by D.D drawn in favour <strong>of</strong> Director, <strong>STPI</strong> shall befurnished along with quotation. The contractor whose tender is accepted will be required to furnish performanceguarantee <strong>of</strong> 5% <strong>of</strong> tendered amount by D.D drawn in favour <strong>of</strong> Director S.T.P.I. S.T.P.I does not bind itself to accept the lowest or any other tender and reserves toitself the authority to reject any or all tenders received without the assignment <strong>of</strong>any reasons. The tender for the work shall remain open for acceptance for a period <strong>of</strong> 60 daysfrom the date <strong>of</strong> opening <strong>of</strong> tender. If any tenderer withdraws his tender before thesaid period or issue <strong>of</strong> letter <strong>of</strong> acceptance which ever is earliest or makes anymodifications in terms & conditions <strong>of</strong> the tender which are not acceptable to thedepartment then S.T.P.I shall without prejudice to any other right or remedy be atliberty to forfeit 50% <strong>of</strong> the said EMD as afore said. Further the tenderer shall notbe allowed to participate in the re-tendering process <strong>of</strong> work. State and central labour laws are to be complied by the contractor. Water and electricity required for execution <strong>of</strong> work will be supplied bydepartment free <strong>of</strong> cost. Rates shall be quoted in words & figure. The amount to be worked out to wholenumber. Conditional quotes will not be accepted.Tender_document_for_AMC_for_fire_fighting 12/25


A- MAINTENANCE AND OPERATION OF WET RISER SYSTEMINTRODUCTIONThis cover suggestive guidelines for maintenance and operation <strong>of</strong> the wet riser system inthe building (Ground plus 3floors).There are two wet-riser in the building.Objective:-i) To keep the entire system fully operational and functional at all times.ii) In case full system can not be kept functional for unavoidable reason as much aspossible, the installation shall be retained functional by isolating the defectivesection.MAINTENANCE REQUIREMENT OF SYSTEM COMPONENTSFor maintaining fire fighting system following points are to be taken care <strong>of</strong>:- To ensure availability <strong>of</strong> water in UG tank all the time and to maintain the tanksin clean condition. To ensure that the piping system is free from leakage. <strong>An</strong>y portion found to beleaking is to be isolated, rectified and connected with healthy system in shortestpossible time. To ensure that all pumps are in good running condition. <strong>An</strong>y pump found to bedefective is to be isolated by closing valves and attended immediately and put into service in minimum time. To ensure availability <strong>of</strong> power for electrical pumps, working <strong>of</strong> starters, switchgear and other electrical components. To ensure healthiness <strong>of</strong> diesel engine starting system, battery voltage, batterycharger and availability <strong>of</strong> adequate diesel for engine operation. To check all landing valves <strong>of</strong> internal and external hydrants, isolating valves andreplace the defective ones whenever necessary To check automatic operation <strong>of</strong> entire system by opening landing valves atdifferent locations. To conduct fire drill at regular interval. (not later than 6 months)PERIODICAL TESTING: For achieving the objective and meeting the requirement <strong>of</strong> periodical testing andchecking the system is essential. Various activities and their duration have beentabulated in Table 1.Tender_document_for_AMC_for_fire_fighting 13/25


PROCEDURE: Though the fire fighting system operation is automatic, however for dailychecking and attending to the system in case <strong>of</strong> operation, a trained pump operatorshall be available round the clock on 24*7 basis. Operation and maintenance instructions shall be available in the pump room andfire control room. Water for fire fighting purpose is shall be changed / cleaned as per exigencies Maintaining Diesel Engine is very important for the system operation. It shall begot done by authorized service centre <strong>of</strong> manufacturer. Adequate diesel shouldeither be available in the pump house or near by so that operation is notdiscontinued for want <strong>of</strong> diesel.-Management is required. If any out let is found to be defective and replacement is not easily available thewhole assembly should be removed and be replaced by bank <strong>of</strong>f plate so that thesystems remain operational. Hose reels shall be subjected to regular inspection to ensure that all valves arefunctional, out let nozzle not chocked. At least once in a year the same shall besubjected to operation to ensure that hose reel is in good condition and that thecoupling joints are water tight. Flow should also be checked for the leakage <strong>of</strong>hose reel. All isolating valves shall be checked for operation. The valves in closed positionbe opened and closed couple <strong>of</strong> times and the valves in open position be closedand opened couple <strong>of</strong> times so that when required, the valves perform theirfunction. Hose pipes and their coupling shall be checked to ensure there is no leakageduring their use. The female coupling cam tooth mechanism be operated andlubricated for ensuring ease <strong>of</strong> operation. Power supply to the pump house is not to be discontinued for any reason. It has to be ensured that there are no obstructions in front <strong>of</strong> the hydrantsimpending accessibility.FIRE DRILL For making the users familiar with the system, fire drill shall be carried out oncein six months. Local fire service and nodal <strong>of</strong>ficers in charge <strong>of</strong> various parts <strong>of</strong>the building shall be involved in conducting fire drill. Operation <strong>of</strong> the systemTender_document_for_AMC_for_fire_fighting 14/25


shall be demonstrated so that all users are confident <strong>of</strong> the system and aware <strong>of</strong>their duties and responsibilities during fire.TABLE - 1PERIODICAL TESTING AND MAINTENANCE CHARTSl.NO System Component Activity DurationWater Tanks(i) Level Check Daily1.(ii) CleaningOnce in a year2 Pumps3 Engine(i) Running(ii) Test flow(iii) Lubrication(i) Running(ii)Lubrication(iii)Battery(iv) Fuel Tank/RadiatorDaily<strong>An</strong>nuallyQuarterlyDailyQuarterlyWeeklyDaily(v) Servicing As per enginemanufacturer’srecommendations(i) RunningDaily4 Motor5 Piping(ii) Starter(iii) InsulationResistance(i) PressureWeeklyOnce in a yearDailyTender_document_for_AMC_for_fire_fighting 15/25


(ii) FlushingOnce in a year6Valves(landing and isolation) (i) Operation Monthly(i) Operation7 Control System (ii) Connection andSystem ComponentsMonthlyQuarterly(i) Physical checkDaily8 Hose Reel and Hose Pipes(ii) Operation check<strong>An</strong>nually9 Fire Brigade Connections/Inlet(iii) Replacement(i) Physical check(ii) Operation CheckDepending uponphysical condition,Monthly<strong>An</strong>nually10 Instantaneous coupling(i) Physical Check(ii) LubricationMonthlyOnce in Six Months11Painting(i) Out DoorOnce in a yearTender_document_for_AMC_for_fire_fighting 16/25


(ii) In doorOnce in a years13 Hose CabinetOpening & ClosingPairQuarterlyYearlyB- MAINTENANCE OF AUTOMATIC SPRINKLER SYSTEM Maintenance <strong>of</strong> fire fighting installation has been described at A which hold goodfor sprinkler installation also. In addition following points shall be taken care.Number <strong>of</strong> sprinkler available is -------- and it is at basement. Sprinkler shall not be reconditioned or repaired. Used and / or defective sprinklersshall be replaced by new ones. Sprinklers shall not be painted after installation. Spare Sprinklers – A stock <strong>of</strong> spare sprinklers shall be kept in Fire control Roomso that prompt replacement is possible after operation/damage <strong>of</strong> a sprinkler head.A minimum <strong>of</strong> 5% <strong>of</strong> the installed capacity or 25 sprinklers <strong>of</strong> all types whichever is more shall be kept in stock. Spanners for sprinklers and Teflon tape shall also keep along with spare sprinklersin readiness. As far as possible, the installation shall be maintained in operating condition byblanking <strong>of</strong>f pipe work feeding the in operative part or parts where work aretaking place. The in operative part, if defective shall be attended to and connected with theoperative system.Action following Sprinkler operation: Following the operation <strong>of</strong> sprinklers, the operated head shall be replaced withnew ones and water supply shall be restored. The sprinklers in the vicinity <strong>of</strong> the operated sprinklers shall also be checked fordamage by heat or any other cause and replaced if necessary.Tender_document_for_AMC_for_fire_fighting 17/25


Each detector shall be checked for correct operation using specified testequipment and method, except non-reset-able detectors. Visual inspection shall be made to confirm that all cable fitting andequipment are secure, undamaged and adequately protected. At least once every three years, at the annual inspection, the electricalinstallation shall be tested. <strong>An</strong>y defect shall be accorded in logbook and suitable remedial actiontaken. On completion <strong>of</strong> the annual inspection entry shall be made in register inrespect <strong>of</strong> defects found. After the defects are rectified, the entries shallagain be made.GENERAL POINTS ABOUT DETECTORS: It is essential to ensure specified range <strong>of</strong> sensitivity range shall be checkedon equipment as specified. If the operation <strong>of</strong> the alarm so<strong>under</strong>s and / or the transmission <strong>of</strong> the alarmsignal has been prevented by disconnection, then a further test shall becarried out to prove the final reinstatement <strong>of</strong> the so<strong>under</strong>s, and ifpermissible, the alarm transmission circuit. A visual examination <strong>of</strong> the battery and connections shall be made to ensurethat they are in good conditions. Action shall be taken to remedy anydefect, including low electrolyte level. <strong>An</strong>y defect shall be recorded in the logbook, reported to the responsibleperson, and action taken to correct it.QUARTERLY INSPECTION AND TESTThe following checklist and test sequence is recommended. Entries in the log book since the previous inspection shall be checked foractions. Batteries and their connections shall be examined and tested to ensure thatthey are in goods serviceable condition. Where provided, secondary batteries shall be examined to ensure that thespecific gravity <strong>of</strong> electrolyte in each cell is correct. Necessary remedialaction must be taken and an appropriate entry made in the logbook. Contamination <strong>of</strong> electrolyte can ruin a cell. Care shall be taken to ensure that hydrometers, vessels, etc. used in theservicing <strong>of</strong> alkaline secondary cells are not contaminated by acid and viceversa. Primary batteries, including reserves, shall be tested to verify that they aresatisfactory for a further period. The alarm functions <strong>of</strong> control and indicating equipment shall be checked bythe operations <strong>of</strong> a trigger device in each zone as described. The operation <strong>of</strong> alarm so<strong>under</strong>s and any link to remote manned centre shallbe tested.Tender_document_for_AMC_for_fire_fighting 20/25


All ancillary functions <strong>of</strong> the control panel shall also be tested wherepracticable. All fault indicators and their circuits shall be checked preferably bysimulation <strong>of</strong> fault conditions. It is essential to apply frequent sensitivity checks and routine tests asprescribed in the rules so that the correct sensitivity levels/degree ismaintained during the entire service span <strong>of</strong> the installation.CLEANING AND MAINTENANCE:- Detectors require periodic cleaning to remove dust or durt accumulated. Thefrequency <strong>of</strong> cleaning depends on the type <strong>of</strong> detector and the local ambientconditions. In any case, the interval shall not exceed a period <strong>of</strong> 3 months,for each detector. The cleaning, checking, operating and sensitivity adjustment shall beattempted only after referring manufacturers’ instructions. These instructions shall details methods such as creating vacuum to removeloose dust and insects or washing heavy greasy and grimy deposits,following partial disassembly or the washing <strong>of</strong> detectors to removecontamination.D- FIRE PUMP HOUSEAll the fire pumps shall be run every day at least for 5 minutes and following datas shallbe noted:1. Auto start and sequential operations <strong>of</strong> pumps wherever applicable.2. Rated and shut <strong>of</strong>f pressures <strong>of</strong> pump.3. Rated current for electric motor.4. Speed <strong>of</strong> diesel engine and setting <strong>of</strong> governors.5. Sound <strong>of</strong> prime mover/pumps should be carefully listened and shall beregistered in for future checks.The glands/packing <strong>of</strong> pumps, sluice valves shall be maintained in good condition andany leakage there in shall be stopped immediately.Special care be taken to check working <strong>of</strong> non-return valves.Bearing caps shall be checked weekly and topped up.Correct type <strong>of</strong> oil/grease must be used as per lubrication survey.Tender_document_for_AMC_for_fire_fighting 21/25


Starter contacts shall be checked weekly and be replaced if necessary.Insulation resistance <strong>of</strong> motors shall be checked once in 6 months and record shall bemaintained.Starting mechanism <strong>of</strong> diesel engine, battery, chargers must be checked regularly.As far as possible the starting mechanism and its auxiliaries shall be uniform for all thediesel engine driven fire pumps. There shall at least one set alternative available forimmediate replacement.Diesel tank provided inside the fire pump room shall be checked every day andmaintained to full capacity.Level <strong>of</strong> water in prime tank shall be checked daily.In case <strong>of</strong> negative suction, leaking <strong>of</strong> foot-valve may cause serious problems for starting<strong>of</strong> pump. Auto filling arrangement for priming tank shall be ensured and checked-upevery day.Sump pump provided in the fire pump room shall also be kept in good working condition.All the fire pumps/engine shall be over hauled turn by turn once in 2 years.E- FIRE EXTINGUISHERSPerformance <strong>of</strong> moving partsPlunger/Nozzle conditionsBrass partsHydraulic test <strong>of</strong> containerWeight <strong>of</strong> catdriges/CO2weeklyWeeklyQuarterlyEvery 5 YearQuarterlyTender_document_for_AMC_for_fire_fighting 22/25


FIRE FIGHTING SYSTEM AVAILABLEFire alarm system and extinguishersOptical electric type smoke DetectorsElectronic Hooters (4 Watts)Manual call button stationsResponse indicatorsRepeater panelMicro-ProcessorMicro-Processor based Alarm section Panels-08Dry chemical type fire extinguisher 5 Kgs capacity269 No’s29 No’s27 No’s98 No’s1 No1 No5 No’s22 No’sSPRINKLER SYSTEMMS pipe Medium grade150mm Dia100mm Dia80mm Dia65mm Dia50mm Dia32mm Dia25mm DiaFlow SwitchStrainer with Brass MeshSprinkler Alarm Valve 150mm Size47.87 Mtrs44.66 Mtrs79.55 Mtrs6.26 Mtrs13.30 Mtrs173.09 Mtrs326.16 Mtrs1 No1 No1 NoTender_document_for_AMC_for_fire_fighting 23/25


Sprinkler Heads165 No’sHYDRANT SYSTEMJOCKEY PUMPMAIN ELECTRIC PUMPSPRINKLER PUMPDIESEL ENGINE PUMP1 Set1 Set1 Set1 SetFIRE FIGHTING EQUIPMENTSingle Headed oblique Type Hydrant ValveFirst- Aid HOSEREELS (30 Mtrs)C.P.Hoses 15.0 Mtrs LongC.P.Hoses 7.50 Mtrs LongHeavy Duty Nozzles (Brass)Hose Boxes Accommodating 2 nos C.P.Hoses 15 Mtrs12 No’s8 No’s8 No’s16 No’s12 No’s4 No’sHose Boxes Accommodating 2 nos C.P.Hoses 7.5 Mtrs8 No’sFire Brigade Inlets (4 way)Fire Brigade Inlets (2 Way)1 No1 NoACCESSORIESPressure SwitchesPressure Guage 100mm DiaPriming Tank4 No’s6 No’s1 NoC.I.Foot Valves200mm Dia80mm Dia3 No’s1 NoTender_document_for_AMC_for_fire_fighting 24/25


C.I.Sluice/Gate Valves150mm Dia100mm Dia65mm Dia9 No’s3 No’s2 No’sG.M.Sluice Valve (ISI)50mm Dia25mm DiaAir Release Valves 25mm Dia4 No’s15 No’s2 No’sC.I. Non-Return Valves150mm Dia100mm Dia65mm Dia3 No’s3 No’s2 No’sMS pipes (Meadium Grade)200mm Dia150mm Dia100mm Dia80mm Dia65mm Dia50mm Dia25mm Dia7.91 Mtrs262.97 Mtrs20.32 Mtrs9.62 Mtrs9.84 Mtrs5.92 Mtrs34.92 MtrsTender_document_for_AMC_for_fire_fighting 25/25