13.07.2015 Views

7 July 2006 Mr. Robert J. Pellatt Commission Secretary British ...

7 July 2006 Mr. Robert J. Pellatt Commission Secretary British ...

7 July 2006 Mr. Robert J. Pellatt Commission Secretary British ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>British</strong> Columbia Utilities <strong>Commission</strong>Information Request 1.21.0Dated 19 June <strong>2006</strong><strong>British</strong> Columbia Transmission CorporationResponse Issued 7 <strong>July</strong> <strong>2006</strong><strong>British</strong> Columbia Transmission CorporationTransmission Revenue Requirement ApplicationTaxes also reflect a reduction due to the refinement of the percentage splitbetween transmission and distribution assets within each station. BC HydroTransmission is charged the total taxes for substations and, in turn, charges aportion of these costs to Distribution through the SDA charge. In F<strong>2006</strong>Distribution was charged a portion of the asset related expenses for the entiresubstation. The percentage split between transmission and distribution withineach station was determined through an engineering assessment. Thisanalysis produced a split of 63.3% for Transmission and 36.7% for Distribution.In F2007 with the transfer and identification of SDAs and common assets thepercentage split within the substations is 72.7% Transmission and 27.3%Distribution. In F2007 this percentage split impacts the grants and taxesassigned to Distribution for SDAs and common assets.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!