13.07.2015 Views

FAK-1: Split Bulkhead Entry Kit for Tubing Bundles

FAK-1: Split Bulkhead Entry Kit for Tubing Bundles

FAK-1: Split Bulkhead Entry Kit for Tubing Bundles

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FAK</strong>-1: <strong>Split</strong> <strong>Bulkhead</strong> <strong>Entry</strong> <strong>Kit</strong>The following installation procedures are suggested guidelines <strong>for</strong>the installation of the <strong>FAK</strong>-1:Receiving, Storing and Handling . . .1. Inspect materials <strong>for</strong> damage incurred during shipping.2. Report damages to the carrier <strong>for</strong> settlement.3. Identify parts against the packing list to ensure the propertype and quantity has been received.4. Store in dry location.Dimensions . . .7-1/2”1-3/4”3”<strong>FAK</strong>-1: <strong>Split</strong> <strong>Bulkhead</strong> <strong>Entry</strong> <strong>Kit</strong> . . .5-1/4”5-1/4”1256834If Electrically Heat Traced• To minimize the potential <strong>for</strong> arcing on electric heat tracing andfi re caused by product damage or improper installation useground-fault protection, the National Electrical Code (NEC) andCanadian Electrical Code (CEC) require ground-fault protection ofequipment <strong>for</strong> each branch circuit supplying electric heat tracing.• Installation must comply with Thermon requirements and beinstalled in accordance with applicable national and local codes.• Component approvals and per<strong>for</strong>mance ratings are based onthe use of Thermon specifi ed parts only. User supplied powerconnection fi ttings must be listed or certifi ed <strong>for</strong> intended use.• De-energize all power sources be<strong>for</strong>e opening enclosure.• Keep ends of bundles, heat tracing and kit components dry be<strong>for</strong>eand during installation.7<strong>FAK</strong>-1: <strong>Bulkhead</strong> <strong>Kit</strong> Contents . . .• Individuals installing these products are responsible <strong>for</strong>complying with all applicable safety and health guidelines.Proper personal protective equipment, or PPE, should beutilized during installation. Contact Thermon if you have anyadditional questions.Item Quantity Description1 1 <strong>Bulkhead</strong> <strong>Entry</strong> Cover (Top)2 1 <strong>Bulkhead</strong> <strong>Entry</strong> Cover (Bottom)3 4 Pan-Head S.S. Screws, #10-32 x .754 4 Kept S.S. Nuts, #10-325 1 Heat Refl ective Tape6 1 Glass Fiber Tape7 3 RTV Sealant Tube8 1 U-Bolt, Washers and NutsTools Required . . .HacksawScrewdriverPliers1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!