13.07.2015 Views

small generator interconnection agreement - Southern California ...

small generator interconnection agreement - Southern California ...

small generator interconnection agreement - Southern California ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page No. 36(c)Participating TO-Constructed Participating TO’s InterconnectionFacilities: The Participating TO shall:(i) TOT427 Substation:1. Review the complete engineering and design drawings, and bill ofmaterials submitted by Interconnection Customer to verify compliancewith the Participating TO’s engineering and design standards;2. Inspect the site during construction to verify compliance withParticipating TO’s materials and construction standards;3. Test TOT427 Substation prior to energization.(ii) Subtransmission:1. Install two (2) tubular steel poles (TSPs) to tap the Antelope-Del Sur 66kV Line, and connect to the new TOT427 Substation to form theAntelope-Del Sur-TOT427 Substation 66 kV Line.2. Three (3) sets of 66 kV pole switches.3. Associated conductor and insulators, as necessary.(iii) Telecommunications:Install light-wave, channel, fiber optic cables and associated equipmentsupporting diverse protection, RTU, and SCADA requirements for theAntelope Power Plant Project <strong>interconnection</strong>. Install fiber optic cable,conduit and poles, as needed from Antelope Substation and Del SurSubstation to the new TOT427 Substation.(iv) Real Properties, Transmission Project Licensing, and EnvironmentalHealth and Safety:Obtain easements and/or acquire land, obtain licensing and permits, andperform all required environmental activities for the installation ofInterconnection Facilities and associated telecommunication equipment.(v) Power System ControlInstall one (1) RTU at the new TOT427 Substation to monitor typicalsubstation elements such as MW, MVAR, terminal voltage and circuitbreaker status and transmit the information to the Participating TO’s GridControl Center. Interconnection Customer will provide generationinformation to this RTU.(vi)Metering:Install revenue meters required to meter the retail load at the SmallGenerating Facility. Notwithstanding that the meters will be located on theInterconnection Customer’s side of the Point of Change of Ownership, theParticipating TO shall own, operate and maintain such facilities as a partof the Participating TO’s Interconnection Facilities.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!