13.07.2015 Views

small generator interconnection agreement - Southern California ...

small generator interconnection agreement - Southern California ...

small generator interconnection agreement - Southern California ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page No. 34ATTACHMENT 2Description and Costs of the Small Generating Facility,Interconnection Facilities, and Metering EquipmentEquipment, including the Small Generating Facility, Interconnection Facilities, andmetering equipment shall be itemized and identified as being owned by theInterconnection Customer or the Participating TO. The Participating TO will provide abest estimate itemized cost, including overheads, of its Interconnection Facilities andmetering equipment, and a best estimate itemized cost of the annual operation andmaintenance expenses associated with its Interconnection Facilities and meteringequipment.The Participating TO’s Interconnection Facilities, Network Upgrades and DistributionUpgrades described in this Attachment 2 are based on the Participating TO’spreliminary engineering and design. Such descriptions are subject to modification toreflect the actual facilities constructed and installed following the Participating TO’s finalengineering and design, identification of field conditions, and compliance with applicableenvironmental and permitting requirements.The naming of the Interconnection Facilities, Network Upgrades and DistributionUpgrades described in this Agreement are for purposes of identification in thisAgreement only. The names of such facilities may be changed during engineering anddesign so as to be consistent with the Participating TO’s facilities naming protocols.1. Interconnection Facilities.(a)Interconnection Customer's Interconnection Facilities. The InterconnectionCustomer shall:(i) Install one (1) 66/34.5 kV 20 MVA main step-up transformer with a 9%percent H-X impedance on a 20 MVA base.(ii)Install a new 66 kV generation tie-line from the Small Generating Facilityto a position designated by the Participating TO, outside of theParticipating TO’s TOT427 Substation, where Interconnection Customershall install a structure (“Last Structure”). This generation tie-line will bereferred to as the Antelope Power Plant Project-TOT427 Substation 66 kVTransmission Line. The right-of-way for the Antelope Power Plant Project-TOT427 Substation 66 kV Line shall extend up to the edge of the TOT427Substation property line.(iii) Install all required CAISO-approved compliant metering equipment at theSmall Generating Facility, in accordance with Section 10 of the CAISOTariff.(iv) Install revenue metering equipment (typically, metering cabinet, voltageand current transformers) at the Small Generating Facility to meter theSmall Generating Facility retail load, as specified by the Participating TO.Metering cabinet must be placed at a location outside of the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!