Page No. 123.4.5 Modification of the Small Generating FacilityThe Interconnection Customer must receive written authorization from theParticipating TO and the CAISO before making any change to the SmallGenerating Facility that may have a material impact on the safety orreliability of the CAISO Controlled Grid or the Participating TO’s electricsystem. Such authorization shall not be unreasonably withheld.Modifications shall be done in accordance with Good Utility Practice. Ifthe Interconnection Customer makes such modification without theParticipating TO's and the CAISO’s prior written authorization, theParticipating TO or the CAISO shall have the right to temporarilydisconnect the Small Generating Facility.3.4.6 ReconnectionThe Parties shall cooperate with each other to restore the SmallGenerating Facility, Interconnection Facilities, the Participating TO’selectric system, and the CAISO Controlled Grid to their normal operatingstate as soon as reasonably practicable following a temporarydisconnection.ARTICLE 4. COSTS FOR INTERCONNECTION FACILITIES & DISTRIBUTIONUPGRADES4.1 Interconnection Facilities4.1.1 The Interconnection Customer shall pay for the cost of the InterconnectionFacilities itemized in Attachment 2 of this Agreement. The ParticipatingTO shall provide a best estimate cost, including overheads, for thepurchase and construction of its Interconnection Facilities and provide adetailed itemization of such costs. Costs associated with InterconnectionFacilities may be shared with other entities that may benefit from suchfacilities by <strong>agreement</strong> of the Interconnection Customer, such otherentities, the CAISO, and the Participating TO.4.1.2 The Interconnection Customer shall be responsible for its share of allreasonable expenses, including overheads, associated with (1) owning,operating, maintaining, repairing, and replacing its own InterconnectionFacilities, and (2) operating, maintaining, repairing, and replacing theParticipating TO's Interconnection Facilities.4.2 Distribution UpgradesThe Participating TO shall design, procure, construct, install, and own theDistribution Upgrades described in Attachment 6 of this Agreement. If theParticipating TO and the Interconnection Customer agree, the InterconnectionCustomer may construct Distribution Upgrades that are located on land ownedby the Interconnection Customer. The actual cost of the Distribution Upgrades,including overheads, shall be directly assigned to the Interconnection Customer.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!