Page No. 103.4 Temporary DisconnectionTemporary disconnection of the Small Generating Facility or associatedInterconnection Facilities shall continue only for so long as reasonably necessaryunder Good Utility Practice.3.4.1 Emergency Conditions"Emergency Condition" shall mean a condition or situation: (1) that in thejudgment of the Party making the claim is imminently likely to endangerlife or property; (2) that, in the case of the CAISO, is imminently likely (asdetermined in a non-discriminatory manner) to cause a material adverseeffect on the security of, or damage to, the CAISO Controlled Grid or theelectric systems of others to which the CAISO Controlled Grid is directlyconnected; (3) that, in the case of the Participating TO, is imminently likely(as determined in a non-discriminatory manner) to cause a materialadverse effect on the security of, or damage to, the Participating TO’sTransmission System, the Participating TO's Interconnection Facilities,Distribution System, or the electric systems of others to which theParticipating TO’s electric system is directly connected; or (4) that, in thecase of the Interconnection Customer, is imminently likely (as determinedin a non-discriminatory manner) to cause a material adverse effect on thesecurity of, or damage to, the Small Generating Facility or theInterconnection Customer's Interconnection Facilities. Under EmergencyConditions, the CAISO or the Participating TO may immediately suspendInterconnection Service and temporarily disconnect the Small GeneratingFacility. The Participating TO or the CAISO shall notify theInterconnection Customer promptly when it becomes aware of anEmergency Condition that may reasonably be expected to affect theInterconnection Customer's operation of the Small Generating Facility orthe Interconnection Customer’s Interconnection Facilities. TheInterconnection Customer shall notify the Participating TO and the CAISOpromptly when it becomes aware of an Emergency Condition that mayreasonably be expected to affect the CAISO Controlled Grid, theParticipating TO’s Interconnection Facilities, or any Affected Systems. Tothe extent information is known, the notification shall describe theEmergency Condition, the extent of the damage or deficiency, theexpected effect on the operation of the Interconnection Customer’s orParticipating TO’s facilities and operations, its anticipated duration, andthe necessary corrective action.3.4.2 Routine Maintenance, Construction, and RepairThe Participating TO or the CAISO may interrupt <strong>interconnection</strong> serviceor curtail the output of the Small Generating Facility and temporarilydisconnect the Small Generating Facility from the CAISO Controlled Gridwhen necessary for routine maintenance, construction, and repairs on theCAISO Controlled Grid or the Participating TO’s electric system. The

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!