13.07.2015 Views

small generator interconnection agreement - Southern California ...

small generator interconnection agreement - Southern California ...

small generator interconnection agreement - Southern California ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page No. 8Interconnection Customer's written test report. Such writtenacknowledgment shall not be deemed to be or construed as anyrepresentation, assurance, guarantee, or warranty by the Participating TOor the CAISO of the safety, durability, suitability, or reliability of the SmallGenerating Facility or any associated control, protective, and safetydevices owned or controlled by the Interconnection Customer or thequality of power produced by the Small Generating Facility.2.2 Authorization Required Prior to Parallel Operation2.2.1 The Participating TO and the CAISO shall use Reasonable Efforts to listapplicable parallel operation requirements in Attachment 5 of thisAgreement. Additionally, the Participating TO and the CAISO shall notifythe Interconnection Customer of any changes to these requirements assoon as they are known. The Participating TO and the CAISO shall makeReasonable Efforts to cooperate with the Interconnection Customer inmeeting requirements necessary for the Interconnection Customer tocommence parallel operations by the in-service date.2.2.2 The Interconnection Customer shall not operate its Small GeneratingFacility in parallel with the Participating TO’s Transmission System withoutprior written authorization of the Participating TO. The Participating TOwill provide such authorization to the Interconnection Customer and theCAISO once the Participating TO receives notification that theInterconnection Customer has complied with all applicable paralleloperation requirements. Such authorization shall not be unreasonablywithheld, conditioned, or delayed.2.3 Right of Access to Premises2.3.1 Upon reasonable notice, the Participating TO and the CAISO may send aqualified person to the premises of the Interconnection Customer at orimmediately before the time the Small Generating Facility first producesenergy to inspect the <strong>interconnection</strong>, and observe the commissioning ofthe Small Generating Facility (including any required testing), startup, andoperation for a period of up to three (3) Business Days after initial start-upof the unit. In addition, the Interconnection Customer shall notify theParticipating TO and the CAISO at least five (5) Business Days prior toconducting any on-site verification testing of the Small Generating Facility.2.3.2 Following the initial inspection process described above, at reasonablehours, and upon reasonable notice, or at any time without notice in theevent of an emergency or hazardous condition, the Participating TO andthe CAISO shall have access to the Interconnection Customer's premisesfor any reasonable purpose in connection with the performance of theobligations imposed on it by this Agreement or if necessary to meet itslegal obligation to provide service to its customers.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!