Page No. 61.5.4 The Interconnection Customer agrees to construct its facilities or systemsin accordance with applicable specifications that meet or exceed thoseprovided by the National Electrical Safety Code, the American NationalStandards Institute, IEEE, Underwriter's Laboratory, and OperatingRequirements in effect at the time of construction and other applicablenational and state codes and standards. The Interconnection Customeragrees to design, install, maintain, and operate its Small GeneratingFacility so as to reasonably minimize the likelihood of a disturbanceadversely affecting or impairing the system or equipment of theParticipating TO and any Affected Systems. The InterconnectionCustomer shall comply with the Participating TO’s InterconnectionHandbook. In the event of a conflict between the terms of this Agreementand the terms of the Participating TO’s Interconnection Handbook, theterms in this Agreement shall govern.1.5.5 Each Party shall operate, maintain, repair, and inspect, and shall be fullyresponsible for the facilities that it now or subsequently may own unlessotherwise specified in the Attachments to this Agreement. Each Partyshall be responsible for the safe installation, maintenance, repair andcondition of their respective lines and appurtenances on their respectivesides of the point of change of ownership. The Participating TO and theInterconnection Customer, as appropriate, shall provide InterconnectionFacilities that adequately protect the CAISO Controlled Grid, theParticipating TO’s electric system, the Participating TO’s personnel, andother persons from damage and injury. The allocation of responsibility forthe design, installation, operation, maintenance and ownership ofInterconnection Facilities shall be delineated in the Attachments to thisAgreement.1.5.6 The Participating TO and the CAISO shall coordinate with AffectedSystems to support the <strong>interconnection</strong>.1.5.7 [This provision is intentionally omitted.]1.6 Parallel Operation ObligationsOnce the Small Generating Facility has been authorized to commence paralleloperation, the Interconnection Customer shall abide by all rules and procedurespertaining to the parallel operation of the Small Generating Facility in the CAISOBalancing Authority Area, including, but not limited to; 1) the rules andprocedures concerning the operation of generation set forth in the CAISO Tarifffor the CAISO Controlled Grid and; 2) the Operating Requirements set forth inAttachment 5 of this Agreement.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!