13.07.2015 Views

ICT-supported end user participation in creative and ... - It.civil.aau.dk

ICT-supported end user participation in creative and ... - It.civil.aau.dk

ICT-supported end user participation in creative and ... - It.civil.aau.dk

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

were different requirements on placement of thereception dep<strong>end</strong><strong>in</strong>g on if it was watched from theentrance or from the <strong>in</strong>side of the entrance hall.The function of the reception related to today<strong>and</strong> future expected functionality was further discussed<strong>in</strong> the Functional Build<strong>in</strong>g Systems Consolidation(FCON) space. Revised solutions wereevaluated <strong>and</strong> discussed <strong>in</strong> the SOL space. See alsoFigures 3–4.A special VR-Wii solution was developed atRambøll provid<strong>in</strong>g the <strong>user</strong>s a simple <strong>and</strong> cost efficientway to navigate <strong>in</strong> the virtual build<strong>in</strong>gs solutions<strong>in</strong> the SOL space. See Figure 5.A particular <strong>user</strong> group was early established totake care of <strong>end</strong> <strong>user</strong> needs <strong>in</strong> connection with <strong>in</strong>teriors<strong>and</strong> facilities <strong>in</strong> meet<strong>in</strong>g spaces <strong>and</strong> commonlocations. In this case VIC-MET was used late <strong>in</strong>the process <strong>in</strong>volv<strong>in</strong>g a choice of specific furniture<strong>and</strong> their placements. Solutions were presented <strong>in</strong>both virtual <strong>and</strong> real sett<strong>in</strong>gs <strong>in</strong> the exist<strong>in</strong>g office.The ma<strong>in</strong> activities took place <strong>in</strong> the FCON <strong>and</strong>SOL spaces. Special regards to possibilities forhous<strong>in</strong>g both social <strong>and</strong> more private meet<strong>in</strong>gswere studied <strong>in</strong> the café space. See Figure 6.4.2 The Arkitema headquarter caseThe Arkitema office project started <strong>in</strong> 2005. Thekick-off procedure <strong>and</strong> early workshops from thiswork gave fruitful <strong>in</strong>put to the VIC-MET development.An <strong>in</strong>tentional focus <strong>in</strong> the office design wasFigure 4. Entrance alternative 2 <strong>in</strong> the new RambollHead Office.Figure 5. A special VR-Wii solution was developed atRamboll.Figure 6. The comb<strong>in</strong>ed café <strong>and</strong> meet<strong>in</strong>g space at thenew Ramboll Head Office.Figure 3. Entrance alternative 1 <strong>in</strong> the new RambollHead Office.to keep the design activities on a high abstractionlevel with focus on common values, needs <strong>and</strong>functional build<strong>in</strong>g performance. User <strong>in</strong>volvementprocedures for the VIC-MET were set-up<strong>and</strong> evaluated for the office space design case.108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!