hVac controls guide for Plans examiners and Building inspectors
hVac controls guide for Plans examiners and Building inspectors hVac controls guide for Plans examiners and Building inspectors
13.07.2015
Views
8 How to Use this Guide
Code Requirements andCompliance Checks
- Page 2 and 3: ContentsIntroduction ..............
- Page 5 and 6: Commercial buildingControl requirem
- Page 7: Prescriptive requirementsfor Comple
- Page 11 and 12: Control Requirements for All System
- Page 13 and 14: Figure 4: Sample control sequence s
- Page 15 and 16: d) Automatic setback and shutdown c
- Page 17 and 18: Figure 9: VSD installed on a supply
- Page 19 and 20: Figure 13: Motorized damperFigure 1
- Page 21 and 22: Building InspectionSuggested Compli
- Page 23 and 24: 4) The supply of outside air is red
- Page 25 and 26: ) Control strategyEconomizers must
- Page 27 and 28: 4) The supply of outside air is red
- Page 29 and 30: must be positioned well down the du
- Page 31 and 32: Figure 23: BAS screen shot indicati
- Page 33 and 34: Code SectionsIECCASHRAE2009: NA 200
- Page 35 and 36: Figure 27: Illustrated control sequ
- Page 37 and 38: Code SectionsIECCASHRAE2009: 503.4.
- Page 39: Building InspectionSuggested Compli
- Page 42 and 43: Building InspectionSuggested Compli
- Page 44 and 45: Figure 38: Sample control sequence
- Page 46: Building Technology ProgramThe U.S.
8 How to Use this Guide