13.07.2015 Views

hVac controls guide for Plans examiners and Building inspectors

hVac controls guide for Plans examiners and Building inspectors

hVac controls guide for Plans examiners and Building inspectors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Dual duct VAV systems should minimize the amount of hot/cold air mixing by reducing flow (figure 37)• Verify that language <strong>for</strong> supply air temperature reset is included in control sequences (figure 38)Figure 37: Sample control sequence <strong>for</strong> dual duct VAV systemOccupied Mode• Cooling○○Full cooling: Cold deck air damper opens to the maximum position.○○As cooling load decreases, cold deck air damper modulates more closed.○○No call <strong>for</strong> cooling: Cold deck air damper closes to the minimum position.• Heating○○Full heating: Hot deck air damper opens to the maximum position.○○As heating load decreases, hot deck air damper modulates more closed.○○No call <strong>for</strong> heating: Hot deck air damper closes to the minimum position.Control Requirements <strong>for</strong> Complex Systems 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!