hVac controls guide for Plans examiners and Building inspectors

hVac controls guide for Plans examiners and Building inspectors hVac controls guide for Plans examiners and Building inspectors

energycodes.gov
from energycodes.gov More from this publisher
13.07.2015 Views

Figure 34: Mechanical schedule showing cooling tower fans equipped with VSDCOOLING TOWERSymbolLocation ServedCT-1ChillerHeat Rejection Tons 800Type Cells 1DischargeVerticalFluid EWT (°F) 90LWT (°F) 77Flow (GPM) 1,500Ambient (°F) 67Nozzle (ft WG) 4FluidWaterFan Type AxialNumber 1Air flow (CFM) 170,000Motor HP 25ControlVFDVoltage/Phase 460/3Basin Heater Number 1Capacity 12Voltage/Phase 460/3Pipe Connections Supply (in) 10Return (in) 14Make-up (in) 2Drain (in)1 ½Overflow (in) 3Weight LBS 31,000Basis of Design Manufacturer ABC IncModelModel XYZNotesFigure 35: Sample note on mechanical scheduleNOTE: Cooling tower fan VFD modulates speed to maintain condensing water temperature setpoint.Control Requirements for Complex Systems 41

Figure 34: Mechanical schedule showing cooling tower fans equipped with VSDCOOLING TOWERSymbolLocation ServedCT-1ChillerHeat Rejection Tons 800Type Cells 1DischargeVerticalFluid EWT (°F) 90LWT (°F) 77Flow (GPM) 1,500Ambient (°F) 67Nozzle (ft WG) 4FluidWaterFan Type AxialNumber 1Air flow (CFM) 170,000Motor HP 25ControlVFDVoltage/Phase 460/3Basin Heater Number 1Capacity 12Voltage/Phase 460/3Pipe Connections Supply (in) 10Return (in) 14Make-up (in) 2Drain (in)1 ½Overflow (in) 3Weight LBS 31,000Basis of Design Manufacturer ABC IncModelModel XYZNotesFigure 35: Sample note on mechanical scheduleNOTE: Cooling tower fan VFD modulates speed to maintain condensing water temperature setpoint.Control Requirements <strong>for</strong> Complex Systems 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!