13.07.2015 Views

hVac controls guide for Plans examiners and Building inspectors

hVac controls guide for Plans examiners and Building inspectors

hVac controls guide for Plans examiners and Building inspectors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4) The supply of outside air is reduced to the design minimumwhen one of the following conditions applies:• Outside air temperature exceeds:• 75°F in climate zones 1B, 2B, 3B, 3C, 4B, 4C, 5B, 5C, 6B, 7, or 8• 70°F in climate zones 5A, 6A, or 7A• 65°F in any other climate zone• The climate specific shut off condition is reached, as determined by anotherapproved approach from the code sections referenced in section c below.5) The economizer will reduce outside air to the minimum requirement when outsideair no longer provides cooling or when the system is in a heating mode.* If the building is equipped with a building automation system (BAS), then these capabilities will most likely beprovided by the BAS. The BAS specifications or manual should indicate that the required capabilities are present.Figure 19: Economizer control strategy shown in a control sequenceModulating Economizer• Controls position of a damper based on the Control State, Outside Air Temperature (OAT), <strong>and</strong> CoolingDem<strong>and</strong>.• Economizer available if:○○○○Cooling mode <strong>and</strong> fan onEcon. low limit temp SP < OAT < Econ. temp SP• When available, economizer:○○Locks out other cooling when Cooling Dem<strong>and</strong> < 25%○○Modulates from minimum to maximum position as Cooling Dem<strong>and</strong> increases from 0% to 25%<strong>Building</strong> InspectionSuggested Compliance Check(s):• Review the mechanical plans <strong>and</strong> verify that economizers have been providedon air h<strong>and</strong>lers as shown in the approved mechanical design.• Confirm that economizer operation is controlled as specified in the approvedmechanical design. This will often mean confirming that a building automationsystem has been installed <strong>and</strong> connected to the economizer.Control Requirements <strong>for</strong> Complex Systems 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!