13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

91Dy.Ex. Engr.K 1 = Percentage of labour component as indicated above.L 0 = Basic Consumer price Index for Pune centre shall be average priceindex for the quarter preceding the month in which the last dateprescribed for receipt of tender, falls.L 1 = Average consumer price index for Pune centre for the quarter underconsideration.(2) Formula for Material ComponentV 2 = 0.85 x P x { K 2 x ( M 1 - M 0 ) } where,100 M 0V 2 = Amount of price variation in Rupees to be allowed for Materialscomponent.P = Same as worked out for labour component.K 2 = Percentage of material component as indicated above.M 0 = Basic wholesale price Index shall be average wholesale price index forthe quarter preceding the month in which to the last date prescribed forreceipt of tender, falls.M 1 = Average wholesale price index during the quarter under consideration.(3) Formula for Petrol , Oil, and Lubricant ComponentV 3 = 0.85 x P x { K 3 x ( P 1 - P 0 ) } where,100 P 0V 3 = Amount of price variation in Rupees to be allowed for POL component.P = Same as worked out for labour component.K 3 = Percentage of Petrol, Oil and Lubricant component.P 0 = Average Price of HSD at Mumbai during the quarter preceding themonth in which the last date prescribed for receipt of tender falls.P 1 = Average price of HSD at Mumbai during the quarter underconsideration.(4) Formula for Bitumen ComponentV 4 = QB x ( B 1 - B 0 )where,V 4 = Amount of price variation in Rupees to be allowed for Bitumencomponent.QB = Quantity of Bitumen (Grade) in metric tones used in the permanentworks and approved enabling works during the quarter underconsideration.B 1 = Current, average ex-refinery price per metric tonne of Bitumen (Grade)under consideration including taxes (octroi, excise, sales tax) during thequarter under consideration .B 0 = Basic rate of Bitumen in rupees per metric tonne as considered forworking out value of P or average ex-refinery price in rupees per metricton including taxes (octroi, excise, sales tax) of Bitumen underSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!