13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

90Dy.Ex. Engr.Accompaniments to Government ResolutionPublic Works Department No. CAT/06/04/148, dated 16/5/2005.PRICE VARIATION CLAUSEIf during the operative period of the contract as defined in condition (i) below ,there shall be any variation in the Consumer Price Index (New Series) for industrialworkers for Pune Centre as per the Labour Gazette published by the Commissionerof Labour, Government of Maharashtra and / or in the Wholesale Price Index for allcommodities prepared by the Office of Economic Advisor, Ministry of Industry,Government of India, or in the price of Petrol/ Oil and Lubricants and majorconstruction materials like Bitumen, Cement , Steel , various types of metal pipes etc.,then subject to other conditions mentioned below, price adjustment on account of 1)Labour Component 2) Material Component 3) Petrol , Oil and Lubricants Component4) Bitumen Component 5) HYSD and Mild Steel Component 6) Cement Component7) C.I. and D.I. Pipes Component, calculated as per the formulae hereinafterappearing shall be made. Apart from these , no other adjustments shall be made tothe contract price for any reasons whatsoever. Component percentage as givenbelow are as of the total cost of work put to tender. Total of Labour, material andPOL components shall be 100 and other components shall be as per actuals.1. Labour Component : K 1 06.00%2. Material Component : K 2 74.00%3. POL Component : K 3 20.00%100%4. Bitumen Component : Actual5. T.M.T./HYSD &Steel Component : Actual6. Cement Component : Actual7. C.I. and D.I. Pipe Component : ActualNote : If Cement, Steel, Bitumen, C.I. and D.I. Pipes are supplied on Schedule'A' , then respective component shall not be considered. Also if particularcomponent is not relevant same shall be deleted.(1) Formula for Labour ComponentsV 1 = 0.85 x P x { K 1 x ( L 1 - L 0 ) } where,100 L 0V 1 = Amount of price variation in Rupees to be allowed for labour component.P = Cost of work done during the quarter under consideration.Minus the cost of Cement, HYSD and Mild Steel, Bitumen, C.I. andD.I. Pipes calculated at the basic star rates as applicable for thetender, consumed during the quarter under consideration( These star rates shall be specified here )1. Bitumen (60/70) VG-30 Grade : Rs. Per M.T.2. Cement : Rs. Per M.T.Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!