89Dy.Ex. Engr.7. The procurement of cement/ steel etc. should be from the authorisedmanufacturing company and the vouchers regarding purchase thereof shall besubmitted to Engineer-in-charge.8. The testing charges shall be entirely borne by the Contractor.---------------------------------------------------------------------------------------------------------------SPECIAL ATTENTION OF CONTRACTOR FOR EXECUTIONProcurement of Material :Department will not supply any material for execution of work such as Cement,Tor Steel, Asphalt etc. The contractor has to arrange the same from his own source.The quality of the material brought to the site by the contractor should be verifiedthrough the various tests provided as per relevant Indian Standards at the cost of thecontractor.The adjustment for variation in cost prices of Mild steel and Tor steel bars,structural steel, cement ( all tested quality) shall be separately made corresponding tothe difference in the cost as per the basic price mentioned hereafter as per PriceVariation Clause.The contractor shall construct shed/sheds at his own cost and as per directionof Engineer-in-charge for storing the materials brought by him and provide doublelocking arrangements, one lock shall be in the charge of departmental person and thematerial shall be taken for use in presence of the departmental person only.---------------------------------------------------------------------------------------------------------------ENSURING GRADE OF ASPHALT BROUGHT ON SITE BY THE CONTRACTORIt shall be mandatory on the part of the contractor to procure the asphalt fromGovernment owned Refinery only. The contractor shall communicate the schedule ofarrival of bouzer of asphalt to the Engineer- in-charge in advance. Apparatus andequipment for testing grade of asphalt shall be made available by the contractor atsite. If the grade of asphalt is found as per specification written permission will begiven for unloading the bouzer by the Engineer –in-charge , otherwise writteninstructions will be given for not using the same on site. ( Please refer GovernmentCircular ( Marathi) No. Misc 2005/CR-187/ N.H.2, dated 8/10/2007.Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!