13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contractor tosupply plant, ladder,scaffolding, etc.and is liable fordamages arisingfrom non provisionsof light, fencing etc.70Dy.Ex.Engr.Clause 21- The Contractor shall supply at his own cost allmaterial (except such special materials, if any, as may, inaccordance with the contract, be supplied from the P.W.D.stores ), plant, tools, appliances, implements, ladders,cordage, tackles, scaffolding and temporary works requisiteor proper for the proper execution of the work, whether inthe original, altered or substituted form, and whetherincluded in the specification or other documents forming partof the contract or referred to in these conditions or not andwhich may be necessary for the purpose of satisfying orcomplying With the requirements of the Engineer-in – chargeas to any matter as to which under these conditions he isentitled to be satisfied, or which he is entitled to requiretogether with the carriage therefor to and from the work.The Contractor shall also supply without charge therequisite number of persons with the means and materialsnecessary for the purpose of setting out works and counting ,weighing and assisting in the measurement or examinationat any time and from time to time of the work or the materials.Failing this the same may be provided by the Engineer-inchargeat the expense of the Contractor and expenses maybe deducted from any money due to the Contractor under thecontract or from his security deposit or the proceeds of salethereof, or a sufficient portion thereof. The contractor shallprovide all necessary fencing and lights required to protectthe public from accident, and shall also be bound to bear theexpenses of defense of every suit, action or other legalproceedings, at law that may be brought by any person forinjury sustained owing to neglect of the above precautions,and to pay any damages and costs which may be awardedin any such suit action or proceedings to any such person, orwhich may with consent of the Contractor be paid forcompromising any claim by any such person.List of machinery in Contractor’s possession andwhich he proposes to use on the work should be submittedalong with the tender.Clause 21 (A)- The Contractor shall provide suitablescaffolds and working platforms gangways and stairwaysand shall comply with the following regulations in connectiontherewitha)Suitable scaffolds shall be provided for workmenfor all works that cannot be safely done from aladder or by other means.b) A scaffold shall not be constructed, taken downor substantially altered except:-i) Under the supervision of a competent andresponsible person, andSignature of the Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!